My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HOUSTON HARRIS PCS, INC. 5 - 2014
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2021
>
HOUSTON HARRIS PCS, INC. 5 - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2018 4:49:35 PM
Creation date
10/29/2014 1:13:18 PM
Metadata
Fields
Template:
Contracts
Company Name
HOUSTON HARRIS PCS, INC.
Contract #
A-2014-174
Agency
PUBLIC WORKS
Council Approval Date
7/15/2014
Expiration Date
6/30/2015
Insurance Exp Date
6/24/2016
Destruction Year
2021
Notes
Amended by A-2014-174-01, -02
Document Relationships
HOUSTON HARRIS PCS, INC. 5A - 2014
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2021
HOUSTON HARRIS PCS, INC. 5B - 2014
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
hnplenientatimiPlan <br />This process is repeated for each fine segment, <br />VaGUUMad material remains In the debris tank until property disposed, per Change County <br />rt; <br />Sanitation District requirements, Although conditions of the sanitary sewer systems may <br />vary, and Impact daily production, the typical production ranges for pre -Inspection cleaning <br />are 3,50OLF to 5,50OLF per hourwork day. <br />M enutaux+W,qv <br />Video Inspection Operations <br />0 <br />The video inspection begins at the upstraam portion of the designated start location working <br />downstream systematically providing a complete and accurate assessment of each line <br />sagment. This assures accurate, completed sections prior to moving to the next focatlon <br />thus eliminating the possibility of skipped or missed runs. Whenever necossary a reverse <br />set upas attempted prior to passing to the next .section. The field supervisor will survey the <br />inspection area d1.1 -ring daytime hof m, the day prior to reassure all manholes are marked <br />and accessible. <br />Houston and Harris personnel possess experience and have demonstrated proficiency in <br />the 1nffm1v[AP',MSAfjware. This experience and expertise will provide the maximum capacity <br />for smooth systems and coordination with the city's infrastructure, <br />All operators are NASSCOMAMMACI' certified and receive additional training and <br />refresher exams in the operation and consistent recording practices required at Houston & <br />Harris. Each tine is approached with the same methodology and accuracy, Picture duality <br />fe and digital video are standards that must pass through a thorough Inspection In our QC <br />Department. Every line segment is examined for quality, accuracy and completeness prior <br />190 to the client receiving the finished product. <br />.. <br />City yr Bonfo Ana We 413410 <br />C IDS nd Clrcull Tel nvleton (ac Ny In sp doun of snMWry $nw#S, <br />—.. Z1831 Torr —....,_....,_, <br />arton Road <br />����}�� �p�"�ace, CA M19 <br />7;�2 �" 9Ah+Il2B99CP 909-g220031F <br />CA 46 -MY <br />25E-29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.