My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - WATER QUALITY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
12/16/2014
>
25E - AGMT - WATER QUALITY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2014 4:11:30 PM
Creation date
12/11/2014 4:07:06 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
12/16/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S L P R 0 P 0 S A L <br />City of Santa Ana I Water Resources Division <br />01.06 -2015 to 12 -31 -2015 <br />Implementation la <br />1. SL will conduct, obtain, and analyze data from various sources to ensure and provide current <br />information regarding water regulations and any variances for California pubic water suppliers. <br />This Incudes obtaining and carefully reviewing the CCR Guidance Manual (a document released <br />each year by the California Department of Public Health Division of Drinking Water and <br />Environmental Management) to assess changes in report content, format, and distribution, <br />ensuring the CCR is in conformance with the State regulations and law. SL will also monitor the <br />Department's website for changes In required content such as terms of newly adopted Maximum <br />Contaminant Levels, Public Health Coals, and other revised regulatory requirements, SL is <br />familiar with waterquality monitoring regulations for public water systems and has a good <br />understanding of water quality reporting and notification procedures required by federal and <br />state regulatory agencies. <br />2. SL will coordinate all meetings with City staff throughout the term of its agreement. At the onset <br />of SL's engagement, we will call an Initial meeting with the Water Resources Manager, Principal <br />Civil Engineer, and other City staff to discuss the PWA Water Resources Division's objectives, <br />projects, programs and Initiatives for the year. During the meeting, we will discuss and <br />recommend specific content and design themes for the 2014 CCR, as well as refine our <br />production timeline, Content will include, but riot limited to: <br />• Opening message from the Water Resources Manager or PWA Executive Director <br />• Mandatory Requirements: Information about the City's watersystem end sources of water <br />(e.g. ground water, surface water etc,); contacts and a list of opportunities for public <br />participation in decisions that affect drinking water quality; statement In other languages <br />about the Importance of the report and contact Information; definitions of key terms <br />regarding contaminant data; a key of terms and abbreviations; the centerpiece of the CCR: a <br />5 -wd h1. "-t' ...v Hw rc . i)w!- ,,;:..L� <br />table repartinglevels 6f'F'egu a'�el and unregufata� �a ecteacortam1nants, and -if <br />applicable —a Tier 3 public notice fora monitoring violation or other type of violation or <br />situation. The CCR also Includes mandatory statements about: drinking water contaminants; <br />contaminants that may reasonably be expected to be found in drinking water; the risk of <br />infection for some people who may be more vulnerable to contaminants; and special <br />requirements for nitrate, arsenic, and lead. <br />Articles about the status of California's drought, water and energy conservation tips, other <br />green Initiatives, ways to prevent source water pollution, important public works projects In <br />development, rebate programs, landscaping tips, water education programs sponsored by <br />the City, and more. <br />Page 1 4 <br />25E -12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.