My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT - DELHI DIVERSION PROJECT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
12/16/2014
>
25F - AGMT - DELHI DIVERSION PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2014 4:17:06 PM
Creation date
12/11/2014 4:08:50 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
12/16/2014
Destruction Year
2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />REQUEST FOR PROPOSALS <br />FOR <br />DESIGN AND CONSTRUCTION SUPPORT OF THE SANTA ANA DELHI DIVERSION PROJECT <br />RFP NO. 14 -069 <br />within two (2) weeks of receipt. Contract Change Order reviews shall be completed within two <br />(2) working days of receipt. <br />C. The Consultant shall respond to written Requests for Information (RFI) to provide clarification or <br />resolve discrepancies in the contract documents. Responses shall be completed within three <br />(3) working days. <br />D. The Consultant shall provide periodic field reviews and bring to the attention of the City of Santa <br />Ana any defects or deficiencies in the work by the construction contractor which the Consultant <br />may observe. The Consultant shall have no authority to issue instruction on behalf of the City of <br />Santa Ana, or to deputize another to do so. <br />7. Upon completion of construction, the Consultant shall prepare as- builts and submit them to the City. <br />The Consultant shall incorporate all changes to the plans electronically with all necessary revision <br />notations. Once plans have been updated, a signed set of as -built mylars shall be submitted to the <br />City with an electronic copy (in Microstation V8i CADD and pdf formats) of the final as -built <br />drawings via CD or e -mail. <br />8. The Consultant shall monitor the project progress, maintain project files, and control the quality of <br />the work performed by in -house staff and /or sub - Consultants. Incomplete (not meeting targeted <br />completion) or poor quality work will not be accepted. The Consultant shall revise the documents <br />within a revised schedule set by the City, which may require overtime. No additional compensation <br />for regular or overtime hours necessary to complete this work to the satisfaction of the City shall be <br />approved by the City for the required revisions. It is the responsibility of the Consultant to produce <br />a professional -level quality of work product. <br />9. The Consultant shall attend meetings as required by the City. <br />10. The Consultant shall coordinate plan check, design topics, permits and any other issues with the <br />City, other Agencies, and all utility companies as required. At the direction of the City, the <br />Consultant shall be the liaison with affected agencies. <br />11. The Consultant shall be responsible for to reviewing and approving addenda and clarifications to <br />plans and specifications. <br />12. Sample Project and Schedule: Proposal shall include a narrative for the project approach and <br />steps for the Santa Ana Delhi Diversion Project. Proposal shall also include a timeline to complete <br />the work tasks necessary for the project. Utilize Attachment C from this RFP to complete the <br />comparison forms for the Proposal and Fee Proposal. Note, no staff hourly rates or total design <br />costs shall be included in the Proposal for the project. However, hourly rates and total costs shall <br />be included in the Fee Proposal for the project. <br />A. Indicate any other assumptions made for the project which is described as follows: <br />14 -069 <br />
The URL can be used to link to this page
Your browser does not support the video tag.