My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT - DELHI DIVERSION PROJECT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
12/16/2014
>
25F - AGMT - DELHI DIVERSION PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2014 4:17:06 PM
Creation date
12/11/2014 4:08:50 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
12/16/2014
Destruction Year
2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Regional Water Quality Control Board — Section 401; <br />• Streambed Alternation Agreements - Section 1600; <br />• CEQA; <br />• Caltrans; and <br />• Department of Airports — URS will develop required easement exhibits identifying the <br />requited land easements within the Newport Beach Golf Club (Airport) property. <br />2.4 Design Criteria Development — In general, all design criteria will be based on The City of Newport <br />Beach Engineering Design Criteria & Standard Plans for Street and Sewer Projects, and Orange <br />County Public Works Standards for channel and flood control related facilities. In areas where special <br />considerations are required, such as crossing the Caltrans Bridge at the Corona del Mar Freeway and <br />Irvine Avenue and areas where Caltrans or the City of Newport Beach may require additional criteria, <br />URS will evaluate the most stringent and /or applicable design criteria for future use. Design criteria <br />findings will be documented and incorporated into the Basis of Design Memorandum for record <br />keeping requirements and future reference. <br />2.5 Santa Ana Delhi Channel Hydraulics — URS currently has developed preliminary channel hydraulics <br />for the portions of the Santa Ana Delhi hydraulically impacted by the proposed diversion structure. <br />In addition, URS also prepared additional hydraulics reviewing the potential impacts of using an in- <br />channel trash screening system. All previous and future HEC -RAS analyses will be based on the <br />Santa Ana Delhi Channel hydraulic analyses prepared by the Orange County Flood Control District. <br />URS will prepare final HEC -RAS hydraulics analyses for the preferred project alternative HEC -RAS <br />hydraulics for the Santa Ana Delhi Channel from the Mesa Drive Crossing to Santa Ana Avenue <br />inclusive of the 2, 5, 10 and 100 -year storm events that will include both the pre - project condition <br />and the post - project condition. Based on the Santa Ana Delhi Hydraulics analysis, URS will develop <br />general operational parameters of the proposed in- channel screening system including water surface <br />elevations and anticipated Flow rates. <br />2.6 Low -Flow Pump AnalXsis — URS has already prepared the preliminary hydraulic analysis for the <br />preferred pipeline route 5. URS will finalize the hydraulic analysis of the proposed low pumping <br />system. The hydraulic analysis will include the development of head -loss calculations from the pumps <br />to the proposed outfall along the alternative force main route. <br />2.7 Initial Geotechnical Considerations — URS will obtain available geotechnical reports associated with <br />the original construction of the Santa Ana Delhi Channel and any geotechnical reports associated <br />with construction within the proposed pipeline rights -of -ways. Based on URS' review of the available <br />documents, a final recommendation as to the final engineering geotechnical study will be provided. <br />URS has included a full geotechnical investigation as required by the City in the Final Engineering <br />Phase of work. If necessary, URS will provide refinements to the original scope of geotechnical <br />services to either exclude un- warranted geotechnical explorations or refine the locations of <br />geotechnical borings. <br />2.8 Initial Structural Considerations — URS will develop structural requirements for the proposed <br />improvements inclusive of required flood control channel sections, underground vaults and support <br />structures for the proposed screening system. Structural recommendations will be prepared and <br />included into the Basis of Design Memorandum for review by the project stakeholders. All structural <br />recommendations will be based on the Orange County Flood Control loading criteria. <br />2.9 Initial Electrical Considerations — URS will develop electrical and power requirements based on the <br />proposed pumping and gating control systems. Electrical loads will be developed and provided to <br />Southern California Edison for power service planning purposes. It is anticipated that SCE will <br />prepare a power service plans to be included as part of the final design documents. <br />UM 25F2346 <br />
The URL can be used to link to this page
Your browser does not support the video tag.