My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RJM DESIGN GROUP INC. 2 - 2014
Clerk
>
Contracts / Agreements
>
R
>
RJM DESIGN GROUP INC. 2 - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2020 11:50:27 AM
Creation date
12/30/2014 4:00:58 PM
Metadata
Fields
Template:
Contracts
Company Name
RJM DESIGN GROUP INC.
Contract #
A-2014-223
Agency
PUBLIC WORKS
Council Approval Date
9/16/2014
Expiration Date
9/30/2015
Insurance Exp Date
9/30/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ch[y of Santa Ana • RFP #14 -036 Landscape A,&iteofural Design for Pacific Electric Park Community Inspired spaces ?V� <br />DESIGN <br />Project Understanding RJ M GROUP <br />will be made to the City staff for incorporating energy and resource usage (i.e. electrical, natural <br />ventilation, natural lighting), building orientation, water usage, and recycling into the restroom <br />design concept. <br />B. Generate initial Design Development Site Plan (in AutoCAD format) from the City provided <br />Conceptual Design Plan. <br />C. Prepare preliminary grading /utility plan to include surface drainage and landscape area drains. <br />Adjust site plan as required. <br />D. Meet with City to review initial Design Development Plan, discuss architectural style and <br />programing for restroom building /shade structure. <br />E. Based on input from City staff, prepare scaled schematic building floor plans for inclusion in final <br />site design. <br />F. Prepare final site design refinements in more detail at a larger scale to include sections, elevations <br />and details based on City comments. The design will depict the general intent of landscape/ <br />hardscape, plant palette, site furnishings, and lighting. The detailed site plan refinement will be <br />used as the base to prepare subsequent construction documents relative to the site architecture, <br />grading and drainage, landscape, irrigation, and electrical engineering associated with the <br />proposed project elements. <br />G. Develop concept floor plan alternatives and elevation concepts with 3D computer - generated <br />images of the exterior design of the restroom shade structure. <br />H. The site design will depict the intent of the drainage design, slope direction, and drainage <br />pipe system. The design will incorporate best management practices for storm water quality <br />management in accordance with the regional water quality district requirements. Utility plan will <br />depict the location and /or relocation of existing utilities as well as new utilities. The project will <br />retain the minimal amount of water required by law or code on -site and the remainder will be <br />directed into the storm drain. <br />I. Prepare materials and color board. Specific materials, finishes, colors, and textures will be selected. <br />Site furnishings and equipment will be selected during this task. <br />J. Prepare preliminary planting plan with consideration to water use hydrozones, exposure, and <br />plant palette. <br />K. Prepare preliminary irrigation concept plan. <br />L. Prepare preliminary lighting and electrical concept plan. <br />M. Prepare preliminary opinion of probable construction costs. <br />7 SAN JUAN CAPISTRANO - SACRAMENTO <br />www.RJMdesigngroup,com • [9491493-2600 <br />
The URL can be used to link to this page
Your browser does not support the video tag.