Laserfiche WebLink
34 <br />City of Sang Ana • RFP= 1114 -036 Landscape Aroh'rtectural Design for'oclflc Electric Park <br />Project Understanding <br />Architectural <br />1. Building Floor Plans <br />2. Foundation Plan Plans <br />3. Roof Framing Plans <br />4. Reflected Ceiling Plans <br />S. Exterior elevations <br />6. Roof Plans <br />7. Interior elevations of the restrooms and other critical areas <br />8. Architectural Details <br />9. Door Schedules and details <br />10. Structural Details, Calculations <br />11. Plumbing Plan, details and notes <br />Mechanical (related to architecture) <br />1. It is anticipated that the restroom building will be naturally ventilated and therefore <br />mechanical plans and details will not be required. <br />Civil Design /Documentation <br />Services during the construction document phase consist of preparation of final civil engineering <br />calculations, drawings and specifications based upon the approved design development documents. <br />1. Title sheet /details <br />2. Details /section sheet <br />Citrus Ranch Park, Tustin, CA- Citrus Theme <br />9 SAN JUAN CAPISTRANO • SACRAMENTO <br />www.RJMdesigngroup,com • [949] 493 -2600 <br />The Park at Riverwalk Restroom Building <br />