Laserfiche WebLink
Cry of Sonto Ana • RFP #14 -036 Lan ascope Arch-ectural Design for Pocific Electric Park <br />Community Li spired Spaces,® <br />Project Understanding <br />3. 20< scale grading plan <br />4. 101scale amphitheater plan <br />S. Field survey <br />6. Horizontal control plan <br />7. Erosion control plan <br />8. Water /sewer plan <br />9. Storm water pollution prevention plan <br />10. Water quality management plan <br />11. Treatment /retention design <br />12. Hydrology study <br />13. Specifications <br />14. Quantities /earthwork <br />15. Process for permit /management <br />Rj DESIGN <br />GROUP <br />Adolfo Medina Memorial Park Dry Streambed <br />D. Site Electrical Design /Documentation <br />Services during the construction document phase consist of preparation of final site electrical <br />drawings, calculations and specifications and shall be completed to include electrical design and <br />engineering as follows: <br />1. Complete site architectural lighting plan. Lighting and power plan to include educational <br />amphitheater, walkway, and security lighting systems, landscape accents. <br />2. Electrical provisions for photovoltaic system on the shade structure <br />3. Location of panels, switchgear, and meter <br />4. Electrical service and distribution <br />S. Telephone and CATV conduit only distribution <br />6. Exterior Title 24 lighting calculations and documentation <br />7. Electrical provisions for irrigation controllers <br />8. Exterior lighting photo metrics <br />9. Electrical load calculations <br />10. Various schedules, legends, sections, details, and instructions, as required <br />11. Electrical specifications <br />SAN JUAN CAPISTRANO • SACRAMENTO 10 <br />www.RJMdesigngroup.com • [949] 493 -2600 <br />