My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH - RESO SA-GG FIXED GUIDEWAY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
01/20/2015
>
75A - PH - RESO SA-GG FIXED GUIDEWAY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2015 4:19:43 PM
Creation date
1/15/2015 4:05:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
75A
Date
1/20/2015
Destruction Year
2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
proposed build alternatives would not result in adverse effects related to roadway segments in <br />the Study Area. <br />(3) Mostly Empty Streetcars. As discussed on page ES -15 of the EA /DEIR, it is estimated that <br />the proposed project would attract between 3,770 and 8,400 riders per day in the 2035 horizon <br />year. At the low end, this represents approximately 22 percent more riders than the TSM <br />Alternative (3,085); at the high end, it represents approximately 172 percent more riders than <br />with the TSM Alternative. Streetcar Alternative 2 would attract between 3,020 and 6,425 <br />riders. At the low end, this would be approximately equivalent to the TSM Alternative; at the <br />high end, it represents approximately 108 percent more riders than with the TSM Alternative. <br />IOS -1 would attract between 2,012 and 4,490 riders, and IOS -2 would attract between 1,540 <br />and 3,280 riders which is approximately 47 percent fewer riders than the full alignment <br />alternatives. It is anticipated that additional ridership modeling will be completed as the project <br />moves forward. <br />(4) Injured Residents. Modern streetcars operate similar to buses in city streets, moving with <br />the flow of traffic and allowing passenger pick -up and drop off at designated stops. Public <br />outreach and education programs would be offered to familiarize local residents and business <br />owners with the new streetcar system. <br />In addition, the system would be required to meet the federal requirements of 49 CFR Part 659 <br />and State requirements of California Public Utilities Commission (CPUC) General Order 164D. <br />These regulations require fixed guideway systems to establish system safety and security <br />programs. Based on the establishment of the safety and security programs, hazards and <br />security threats would be minimized. In addition, CPUC must certify that the project is safe and <br />secure before the project can be placed in revenue service. Following construction, the project <br />would be operated in accordance with OCTA standard operating procedures, operator rules, and <br />the emergency plan. The EA /DEIR analyzed potential public safety impacts and addressed safety <br />concerns associated with schools; Mitigation Measures SAF1 through SAFE, identified on page <br />3 -195 of the EA /DEIR, would be implemented as part of the project. These measures include <br />lighting, fencing, signage and education delivered to students and parents to warn of potential <br />hazards. The EA/DEIR found that with implementation of mitigation measures, no adverse <br />safety impacts would occur. See Response 8 -5(5) for a response to a similar comment on public <br />safety. <br />(5) A Money Pit Residents Cannot Afford. The streetcar funding and fares have not been <br />determined at this time. Information regarding possible funding sources have been identified and <br />are under consideration but not approved. Due to this uncertainty, specific funding sources have <br />not been identified in the REA /FEIR. A financing plan will be developed by OCTA prior to <br />revenue operation of the proposed project. The financial analysis and evaluation for the <br />proposed project is in the Executive Summary Section in Table ES -1 on page ES -15 of the <br />EA/DEIR and shown below. See Response 8 -5(3) for a response to a similar comment on project <br />costs. <br />Santa Ana-Garden Grove Fixed Guideway Project REAIFEIR <br />.January 2015 <br />75A -251 <br />Pa9el193 <br />
The URL can be used to link to this page
Your browser does not support the video tag.