My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH - RESO SA-GG FIXED GUIDEWAY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
01/20/2015
>
75A - PH - RESO SA-GG FIXED GUIDEWAY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2015 4:19:43 PM
Creation date
1/15/2015 4:05:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
75A
Date
1/20/2015
Destruction Year
2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
connections to regional Metrolink and Amtrak commuter rail services at the SARTC, and is <br />compatible with the established urban character. The SA -GG Fixed Guideway Project is a transit <br />improvement project being considered by the Cities of Santa Ana and Garden Grove in <br />cooperation with OCTA and FTA to improve mobility and provide other community <br />enhancements. The project's objectives are derived from the need for transportation <br />improvements in the Study Area, which address a variety of community issues. The <br />identification of these needs and corresponding goals and objectives are stated in Table 1 -1 on <br />page 1 -14 of the EA /DEIR. <br />In addition, and as stated on page ES -5 of the EA/DEIR, the City of Santa Ana would benefit <br />from increased connectivity to the regional transportation network. The eastern terminus of the <br />alignment is the SARTC, which is the busiest multi -modal transportation hub in Orange County <br />and will connect the streetcar to Metrolink, Amtrak, and bus lines from the surrounding region. <br />The western terminus is the Harbor Boulevard /Westminster Avenue intersection, where <br />connections to local and intra- county buses operated by OCTA are available. <br />Response PH3 -19 — Unknown Speaker <br />See Response PH3 -17. The specifications related to boarding procedures have not been <br />identified at this time. The proposed streetcar system will comply with the Americans with <br />Disabilities Act (ADA) requirements to accommodate disabled patrons. <br />Response PH3 -20 — Unknown Speaker <br />Solar power has not been considered as part of the proposed project, although the proposed <br />project does not preclude the future integration of solar power. <br />Response PH3 -21 — Madaleine Spencer <br />The source of funding is not required for consideration in the environmental review process in <br />accordance with CEQA and NEPA regulations. The comment is not directly related to the <br />content or adequacy of the EA/DEIR, and no further response is necessary. <br />Response PH3 -22 — Unknown Speaker <br />Acquisitions requiring displacement would comply with the Uniform Act. Acquisitions related to <br />the build alternatives are shown in Table 3.3 -5 on page 3 -23 of the EA/DEIR. Streetcar <br />Alternative 1 would result in three full acquisitions and six partial acquisitions; Streetcar <br />Alternative 2 would result in six full and ten partial acquisitions; IOS -1 would result in four full <br />and two partial acquisitions; and IOS -2 would result in five full and six partial acquisitions. The <br />amount and type of private property acquisitions were found to result in less- than - significant <br />impacts. <br />Santa Ana - Garden Grove Fixed Guideway Project REAIFEIR P a g el 227 <br />January 2015 <br />75A -285 <br />
The URL can be used to link to this page
Your browser does not support the video tag.