Laserfiche WebLink
Alternative 1 - Memory Lane Pipeline <br />16" Well 32 Transmission Line <br />Construction Cost Estimate <br />Items ; <br />QUantity' <br />Unit bescYjPtjon <br />$496,000 <br />� Total <br />Cost <br />Valves and Appurtenances (Assume 4% of Pipeline Cost) <br />$20,000 <br />$20,000 <br />in.A, <br />C SSt <br />Connection at Well 32 <br />3100 LF <br />Construct 16" PVC Pipeline <br />$160 <br />$496,000 <br />LS <br />Valves and Appurtenances (Assume 4% of Pipeline Cost) <br />$20,000 <br />$20,000 <br />1 EA <br />Connection at Well 32 <br />$5,000 <br />$5,000 <br />1 EA <br />Connection at PRS (Memory Lane) <br />$5,000 <br />$5,000 <br />41500 SF <br />Pavement Slurry Seal (Half of Memory Lane) <br />$0.50 <br />$20,750 <br />LS <br />Prepare and Set -up Traffic Control <br />$40,000 <br />$40,000 <br />LS <br />Sheeting, Shoring and Bracing <br />$10,000 <br />$10,000 <br />LS <br />Mobilization, Demobilization, and Cleanup <br />$60,000 <br />$60,000 <br />Subtotal: <br />$656,750 <br />Contingency (30 %): <br />$198,000 <br />Total: <br />$854,750 <br />CITY OF SANTA ANA <br />251 -73 <br />TETRA TECH, INC. <br />