Laserfiche WebLink
Alternative 2 - Garthe Reservoir Pipeline <br />16" Well 32 Transmission Line <br />Construction Cost Estimate <br />3250 <br />LF <br />Construct 16" PVC Pipeline <br />Unit <br />Total <br />Item <br />Quantity <br />17 Unit Description <br />Colt <br />Cost <br />3250 <br />LF <br />Construct 16" PVC Pipeline <br />$160 <br />$520,000 <br />200 <br />LF <br />Bore and Jack (30" steel casing) <br />$1,500 <br />$300,000 <br />Valves and Appurtenances (Assume 4% of Pipeline <br />$21,000 <br />$21,000 <br />LS <br />Cost) <br />1 <br />EA <br />Connection at Well 32 <br />$5,000 <br />$5,000 <br />1 <br />EA <br />Connection at Garthe <br />$5,000 <br />$5,000 <br />38000 <br />SF <br />Pavement Slurry Seal (Half of Memory Lane) <br />$0.50 <br />$19,000 <br />1 <br />LS <br />Prepare and Set -up Traffic Control <br />$70,000 <br />$70,000 <br />LS Sheeting, Shoring and Bracing $10,000 $10,000 <br />LS Mobilization, Demobilization, and Cleanup $60,000 $60,000 <br />Subtotal: $1,010,000 <br />Contingency (30 %): $303,000 <br />Total: $1,313,000 <br />Constructi*n Most Estimate $1,313,0 <br />CITY OF SANTA ANA <br />251 -74 <br />TETRA TECH, INC. <br />