Laserfiche WebLink
LICENSE <br />In addition to any and all relevant City, State and Federal permits and licenses required in <br />the execution of the contract, the Contractor shall hold a valid and current California C -27 <br />and a C- 61/D49 Contractor License and submit a copy thereof. Both licenses must be in <br />good standing for the previous seven (7) years without any official unresolved record of <br />complaints registered or filed with the Board or California Department of Consumer <br />Affairs. The name and permit number will be supplied to the City at the beginning of <br />contract, and any changes forwarded within twenty -four (24) hours of said change. <br />Q. CONTRACTOR'S OFFICE <br />Contractor is required to maintain an office within a sixty (600) minutes response time of <br />the job site and provide the office with phone service during normal working hours. <br />During all other times, a telephone answering service shall be utilized and the answering <br />service shall be capable of contacting the Contractor by cell phone or pager. Contractor <br />shall have a maximum response time of sixty (60) minutes to all emergencies. <br />Contractor will have full responsibility for maintaining an office and a yard. There will be <br />no on -site storage of equipment or materials, according to City ordinance: <br />Sec. 36 -145. - Same — Commercial vehicles. <br />No person shall park and /or leave standing on any street, or portion thereof, in <br />any residential district located within the city any commercial vehicle with a <br />manufacturer's gross vehicle weight rating of ten thousand (10,000) pounds or <br />more for a period of time longer than two (2) hours. Such restriction shall not <br />apply to any commercial vehicle which is making pickups or deliveries of goods, <br />wares, and merchandise from or to any building or structure located on the <br />residential street, or for the purpose of delivering materials to be used in the <br />actual and bona fide repair, alteration, remodeling, or construction of any building <br />or structure upon the residential street for which a building permit has previously <br />been obtained. <br />R. SCHEDULES <br />The City operates on a four (4) year prune cycle trimming approximately 55,000 trees. <br />The City annually prunes approximately 15,000 trees and approximately 5,000 palms by <br />grid prune. <br />(1) Annual Schedule <br />Upon contract award, the successful Proposer shall be required to submit a work <br />schedule based on the City's annual pruning requirements, removal and <br />placement program, and planting projects. The proposal shall include a <br />recommended annual work program, daily work schedules, personnel and <br />vehicles that would be required to complete the annual maintenance program. <br />Depending on the City's current and future needs, the scheduled work may <br />require multiple crews to perform concurrently within the same time constraints. <br />a. The Contractor shall provide an annual maintenance schedule <br />indicating the time frames when items of work shall be <br />accomplished per the performance requirements. <br />b. The Contractor shall submit revised schedules when actual <br />performance differs substantially from planned performance. <br />City of Santa Ana Street Tree Maintenance RFP <br />19E-23 Page 20 <br />