Laserfiche WebLink
:3 <br />R <br />Labor Force <br />1980 U. S. Census statistics for the 12 census tracts that cover the total <br />project corridor, contained the following distribution of occupations: <br />Crafts <br />Percentage of <br />Occupation <br />Total Labor Force <br />Professional /Technical <br />11.3 <br />Managerial /Proprietor <br />8.8 <br />Clerical <br />14.6 <br />Sales <br />8.1 <br />Total White Collar <br />42.8 <br />Crafts <br />15.0 <br />Operatives <br />19.6 <br />Service <br />12.6 <br />Laborer <br />6.7 <br />Farm Workers <br />3.3 <br />Total Blue Collar <br />57,2 <br />Current unemployment figures for this particular area are not available. <br />Based on field observations, however, it is estimated that the <br />unemployment percentage for the project area is higher than that for <br />the entire City and most certainly higher than the County as a whole. <br />Within the project area, there are no major industrial sites. There are <br />several small quasi- industrial uses such as a metal polishing and plating <br />shop and a few automotive repair services. <br />A number of professional and personal service businesses operate <br />within the boundaries of the project area. These consist primarily of <br />small, one -three employee operations, offering medical, dental, personal <br />care, financial and children day care services to local residents. <br />Utilities <br />Electrical Service <br />Southern California Edison Company (SCE) is responsible for the <br />provision of electrical service to businesses and residents in the City of <br />Santa Ana. Electrical transmission facilities along Bristol Street <br />predominantly consist of overhead utility lines and poles with the <br />exception of two underground sections. The following list of aerial and <br />underground facilities was obtained through telephone conversations <br />EU -57 <br />75C -128 <br />