My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55A - RESO AND AGMT - 800MHZ RADIO SYS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
05/05/2015
>
55A - RESO AND AGMT - 800MHZ RADIO SYS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2015 3:47:28 PM
Creation date
4/30/2015 3:35:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Police
Item #
55A
Date
5/5/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Customer Responsibilities: <br />Santa Ana's key project team participants attend the meeting. <br />Review Motorola and Santa Ana responsibilities. <br />Completion Criteria: <br />• Project kickoff meeting completed. <br />• Meeting notes identify the next action items, <br />4,4.1 Review Contract Design <br />Motorola Responsibilities: <br />• Meet with Santa Ana project team. <br />• Review the operational requirements and the impact of those requirements on various equipment <br />configurations. <br />• Establish a defined baseline for the system design and identify any special product requirements <br />and their impact on system implementation. <br />• Review the System Design, Statement of Work, Project Schedule, and Acceptance Test Plans, <br />and update the contract documents accordingly. <br />• Discuss the proposed Cutover Plan and methods to document a detailed procedure. <br />• Submit design documents to Santa Ana for approval. These docuunents form the basis of the <br />system, which Motorola wilt manufacture, assemble, stage, and install. <br />• Prepare equipment layout plans for staging. <br />• Provide minimum acceptable performance speodiications for microwave, fiber, or copper links. <br />• Establish demarcation point (supplied by the Motorola system engineer) to define the connection <br />point between the Motorola - supplied equipment and Santa Ana - supplied link(s) and external <br />interfaces. <br />• Finalize site acquisition and development plan. <br />Conduct site evaluations to capture site details of the system design and to determine site <br />readiness. <br />Determine each site's ability to accommodate proposed equipment based upon physical <br />capacity. <br />If applicable, test existing equipment with which Motorola equipment will interface. <br />• Prepare Site Evaluation Report that summarizes findings of above - described site evaluations. <br />Customer Responsibilities: <br />Santa Ana's key project team participants attend the meeting. <br />Make timely decisions, according to the Project Schedule. <br />Frequency Licensing and Interference: <br />As mandated by FCC, Santa Ana, as the licensee, has the ultimate responsibility for providing <br />all required radio licensing or licensing modifications for the system prior to system staging. <br />This responsibility includes paying for FCC licensing and frequency coordination fees. <br />Provide the FCC "call sign" station identifier for each site prior to system staging, <br />City of Santa Ana <br />M007500 P25 Dispatch Migration and Subscrlbers <br />02 April 2015 <br />Use or disclosure of tills proposal is subject <br />to the restrictions on the cover page, <br />Statement of Work 4.4 <br />Motorola Solutions Confidential Restricted <br />55A -114 <br />
The URL can be used to link to this page
Your browser does not support the video tag.