My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLEMING INTERNATIONAL INC. - 2014
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2021
>
FLEMING INTERNATIONAL INC. - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2017 4:19:13 PM
Creation date
5/21/2015 12:57:42 PM
Metadata
Fields
Template:
Contracts
Company Name
FLEMING INTERNATIONAL INC.
Contract #
A-2014-273
Agency
FINANCE & MANAGEMENT SERVICES
Council Approval Date
10/21/2014
Insurance Exp Date
9/1/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Prime Contractor agrees to pay each Subcontractor under this prime contract for satisfactory <br />performance of its contract no later than 10 days from the receipt of each payment the Prime <br />Contractor receives from City. Any delay or postponement of payment from the above referenced <br />time frame may occur only for good cause following written approval of the City. This clause <br />applies to both Disadvantaged Business Enterprise (DBE) and non -DBE Subcontractors. <br />The Prime Contractor agrees further to release retainage payments to each Subcontractor within <br />30 days after the subcontractor's work is satisfactorily completed. Any delay or postponement of <br />payment from the above referenced time frame may occur only for good cause' following written <br />approval of the City of Santa Ana. This clause applies to both DBE and non -DBE subcontractors. <br />1.20 AS -BUILT DRAWINGS <br />The Contractor:shall maintain and update the as -built drawings throughout the construction <br />period. The 'As -Built" drawings shall be submitted to the Inspector before completion of the <br />project. Final payment will not be made until As -Built plan is received by the City. <br />1.21 CITY RIGHT TO OWNERSHIP <br />All data, documents and other products used, developed, produced and included in proposal,, in <br />response to RFP, shall become property of the City. All data, drawings, and other documents <br />developed and produced as part of contract agreement shall become property of the City. <br />Proposer information identified as proprietary information shall be maintained confidential, to the <br />extent allowed under the California Public Records Act, <br />1.22 EROSION CONTROL PLAN 1 SWPPP <br />For projects having less than one (1) aere of disturbed soil, contractor shall prepare erosion and <br />sediment control plan and do so immediately after award of the contract for the approval by the <br />City. <br />The plan shall be prepared per the ;applicable guidelines described in the California Storm <br />Water Best Management Practices Handbook, The Contractor shall submit the plans for review <br />and shall make the necessary revisions to the plans as directed by the Project Manager. The <br />plans shall be prepared by a licensed Civil Engineer. The City may waive the requirement of <br />licensed Civil Engineer if the Contractor can satisfactorily prove to the Project Manager that the <br />person preparing the erosion control plan is qualified in the field of erosion control. <br />The Contractor shall keep a copy of the erosion control plan on-site for the duration of the contract <br />and shall provide all necessary control devices to implement all necessary measures as shown on <br />the plan. The erosion control plan shall remain in effect until approval to remove is granted by the <br />City. <br />All erosion control materials shall be available on-site and stockpiled at a convenient location to <br />facilitate rapid construction of temporary devices when rain is eminent. <br />SPECIAL PROVISION — Construction <br />2.00 ROCK PRODUCTS <br />Alternate rock products, asphalt concrete, Portland Cement Concrete and untreated base material <br />shall be alternate rock material — Type S per Section 400 of the Standard Specifications. <br />City of Santa Ana RFP 13-064 <br />Page 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.