My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLEMING INTERNATIONAL INC. - 2014
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2021
>
FLEMING INTERNATIONAL INC. - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2017 4:19:13 PM
Creation date
5/21/2015 12:57:42 PM
Metadata
Fields
Template:
Contracts
Company Name
FLEMING INTERNATIONAL INC.
Contract #
A-2014-273
Agency
FINANCE & MANAGEMENT SERVICES
Council Approval Date
10/21/2014
Insurance Exp Date
9/1/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.01 RELATIVE COMPACTION TESTS <br />The following test methods shall be used for determining relative compaction <br />California Test 216 (Sand Cone Method) <br />California Test 231 (Nuclear Gauge Method) <br />The Contractorwill provide compaction test at locations deemed necessary by the Project <br />Manager. if compaction falls to meet the contract specifications, then the Contractor shall make <br />the necessary adjustments and is responsible for the cost of additional compaction tests until <br />compaction per the specifications is met. <br />2,02 UNCLASSIFIED EXCAVATION <br />This section shall conform to Subsection 300-2 and 300-4 of the Standard Specifications and these <br />Special Provisions, <br />Unclassified excavation shall consist of all excavation including sawcutting and removal of <br />roadways, bituminous pavement; concrete pavement and the removal of curbs, sidewalks; and <br />driveways, etc, as shown on the plans. <br />Payment for Unclassified Excavation shall be paid at the lump sum contract unit prices listed in the <br />Bid Proposal for Site Work and shall include all equipment, post hole excavations, concrete <br />footings and other incidentals as necessary to install complete and in place for the project' as <br />shown on the drawings and specified herein <br />2.03' PORTLAND CEMENT CONCRETE <br />Portland cement concrete (PCC) shall conform to Sections 200, 303 and 400 of the Standard <br />Specifications. <br />Payment for Portland Cement Concrete shall be paid at the lumpsum contract unlit prices listed in <br />the Bid Proposal for Site Work and shall` include -all equipment, post hole excavations, concrete <br />footings and other incidentals as necessary to install complete and in place for the project as <br />shown on the drawings and specified herein <br />2,0=4 CONCRETE CURB GUTTER WALKS DRIVEWAY APPROACHES AND CROSS GUTTERS <br />This Section shall conform to Sections 201, 303 and 400 of the Standard Specifications, <br />Curbs and/or gutters to be constructed shall match existing in all dimensions and shalt conform <br />to Standard Plan No. '1101. Reconstructed curb and gutters shall be constructed so the top of <br />curb matches the sidewalk surface elevation. When the plans do not show replacement limit <br />stations, the Project Manager shall approve replacement limits. Prior to acceptance of the curb <br />and gutter construction by the Project Manager, a flow test shall be conducted by the Contractor in <br />the presence of the Project Manager. <br />All concrete work shall be finished in texture, scoring, banding in generally the same manner as the <br />adjacent existing improvements, unless specified. <br />Payment for Concrete Curb, gutter, walks, driveway approaches and cross gutters shall be paid at <br />the lump sum contract unit prices listed in the Bid Proposal for Site Work and shall include all <br />eauloment. Dost hole excavations, concrete footings and other incidentals as necessary to install <br />of Santa Ana R <br />Page 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.