My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE, COUNTY OF (39) - 2015
Clerk
>
Contracts / Agreements
>
O
>
ORANGE, COUNTY OF
>
ORANGE, COUNTY OF (39) - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 9:58:16 AM
Creation date
8/19/2015 1:12:41 PM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE, COUNTY OF
Contract #
A-2015-130
Agency
Police
Council Approval Date
7/7/2015
Expiration Date
8/31/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 6 —Post Award Requirements 12014 <br />Subgrantee Subgrantees must prepare and submit performance reports to the state for the <br />Performance duration of the grant performance period, or until all grant activities are <br />Reports completed and the grant is formally closed by Cal OES. Subgrantees must <br />complete a Biannual Strategy Implementation Report (BSIR) using the <br />DHS /FEMA Grants Reporting Tool (GRT). <br />To obtain access to the online GRT, please log on to their website at <br />www renorting odp dhs gov. To create a new account, follow the instructions <br />that read, "If you need to register for an account, please click here." <br />• Ehgibility of expenditures, <br />• Comparing actual Subgrantee activities to those approved in the <br />subgr ant application and subsequent modifications, if any. <br />• Ensuring that advances have been disbursed in accordance with <br />applicable guidelines. <br />• Confirming compliance with: <br />• Grant Assurances; <br />• Information provided on performance reports and payment <br />requests; and <br />• Needs and threat assessments and strategies. <br />Many Subgrantees receive "findings" that necessitate a Corrective Action <br />Plan (CAP) on their part. Those Subgrantees who fail to submit a CAP as <br />required shall have a "hold" placed on any future reimbursements until the <br />"finding" is resolved. <br />Note; It is the responsibility of all Subgrantees to monitor and audit the grant <br />activities of their Subrecipients. This requirement includes, but is not limited <br />to, on -site verification of graut activities, as required. <br />17 <br />For additional assistance with the GRT, please contact: <br />Huy Tram at huv.tram @caloes c1 eov or (916) 845 -8649 <br />Failure to <br />Submit <br />Periodic reporting is required by the grant. Subgrantees who miss a singlo <br />reporting deadline may receive a letter addressed to their Board of <br />Required <br />Supervisors informing them of the failure to report. County Operational <br />Reports <br />Areas and Tribal Native Americans who fail to report twice in a <br />row may <br />have subsequent awards reduced by 10% until timely reporting is <br />reestablished. UASIs may have a "hold" placed on any future <br />reimbursements. <br />Monitoring <br />The Cal OES Monitoring Branch is actively conducting monitoring visits, <br />both desk review and on -site, among Subgrantees. These reviews may <br />include, but are not limited to: <br />• Ehgibility of expenditures, <br />• Comparing actual Subgrantee activities to those approved in the <br />subgr ant application and subsequent modifications, if any. <br />• Ensuring that advances have been disbursed in accordance with <br />applicable guidelines. <br />• Confirming compliance with: <br />• Grant Assurances; <br />• Information provided on performance reports and payment <br />requests; and <br />• Needs and threat assessments and strategies. <br />Many Subgrantees receive "findings" that necessitate a Corrective Action <br />Plan (CAP) on their part. Those Subgrantees who fail to submit a CAP as <br />required shall have a "hold" placed on any future reimbursements until the <br />"finding" is resolved. <br />Note; It is the responsibility of all Subgrantees to monitor and audit the grant <br />activities of their Subrecipients. This requirement includes, but is not limited <br />to, on -site verification of graut activities, as required. <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.