My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25I - AGMT - COMPLETE STREETS PLAN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
09/01/2015
>
25I - AGMT - COMPLETE STREETS PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2015 5:59:42 PM
Creation date
8/27/2015 5:04:25 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25I
Date
9/1/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and Advisory Group on the best method to tour these corridors, <br />either by bicycling, walking or bus. <br />With the pre - charrette visit already having been conducted <br />by this time, this event could be used to tour the connectors if <br />pre - selected by the Advisory Group. <br />Hold 2 -3 stakeholder group meetings <br />The intent of these meetings will be to discuss the project and <br />listen to the stakeholders about their issues and concerns for the <br />five corridors.These 2 -3 meetings can combine 1 -2 corridors to <br />expedite the discussion since some of these corridors connect <br />with each other. Specific questions will be developed In advance <br />and distributed to the participants prior to the meeting, so review <br />and further detailed discussions can take place within these meet - <br />ings.This will allow the project team to get focused input from key <br />individuals, active organizations and other interested parties. KPA <br />will document the stakeholder meetings and prepare a summary. <br />Central Santa Ana Complete Street <br />An option is to rent wheelchairs to experience some of the cor- <br />ridor challenges from a disabled person's point -of -view. Specific <br />locations can be identified prior to the walk audits to utilize this <br />approach. <br />Opening Community Workshop <br />The first day of the charrette will be an opening community <br />workshop in the evening with visioning and values exercises. The <br />intent of this workshop is to introduce the project and gather <br />input from residents that can't attend the following charrette days. <br />The following are examples that can be explored for this event: <br />Project overview presentation which will include how other <br />cities and Downtown Santa Ana have implemented complete <br />street changes. An effort will be made to identify streets that <br />have similar characteristics and challenges as those identified in <br />this project. <br />Table exercises to gather general issues, concerns and oppor- <br />tunities will also be available.These exercises will be simple, yet <br />interactive and will focus on the issues and opportunities for <br />each corridor and potential connecting corridors. <br />Since this opening workshop may have an open house feel, and <br />participants may have only a short amount of time to spend at <br />the workshop, the KTU +A team will provide every opportunity <br />to provide materials and an overview of topics discussed prior <br />to their attendance. Options include stations showing a series of <br />videos about complete streets; a running overview of the pre- <br />sentation; infographics; online survey; static informative boards <br />and digital maps; as well as child care and kids activities. <br />Community Design Charrette <br />In the following days, the KTU +A team will hold a series of com- <br />munity workshop activities with table and interactive exercises <br />identifying preferred complete street treatments and designs. Ini- <br />tially the exercises will identify overall issues and concerns along <br />the corridors. The discussion will then focus on more specific lo- <br />cations of concern, and finally on design treatments and improve- <br />ments. Consensus on the priorities and designs will be imperative <br />to garner public support for these improvements for the team to <br />refine the designs and produce cost estimates. <br />Continuing with the theme of Interactive large table maps from <br />the previous evening workshop, new table maps, possibly more <br />than one for each corridor, will be available for issues and con- <br />cerns and design recommendations. <br />While the Downtown Complete Streets Plan was successful with <br />interactive exercises, wrap -ups and recaps, there was a lack of <br />technology that participants of all ages could relate too. KTU +A <br />will bring a new set of interactive tools for both summarizing <br />comments, previous days efforts, and stimulating ideas and de- <br />signs for the recommendations phases. <br />40111-16 <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.