My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25I - AGMT - COMPLETE STREETS PLAN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
09/01/2015
>
25I - AGMT - COMPLETE STREETS PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2015 5:59:42 PM
Creation date
8/27/2015 5:04:25 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25I
Date
9/1/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, 1 =r <br />Alternative Charrette Schedule #2 <br />Another alternative is to hold two separate charrettes based on <br />the locations of the corridors. For example, the 5th Street and Raitt <br />Street corridors, along with connecting corridors, can be held one <br />week, then Bishop Street, St. Andrews Place and Orange Avenue <br />another week. The overall charrette schedules can be very similar <br />with tours, exercises, on -site production and activities. <br />For all charrette schedule alternatives, the closing workshop will <br />be a platform for additional comments and design refinements. As <br />with all other charrette activities and schedule, these options can <br />be vetted through the Advisory Group, <br />Closing Workshop Presentation <br />The closing workshop presentation will consist of draft recom- <br />mendations to the community for feedback, comments and guid- <br />ance.This could be a combination of plotted maps or through a <br />Powerpoint presentation. <br />Task 3 Deliverables <br />Sign -up Sheets from all public events, Results of Exercises, Digital <br />Presentations, Photographs of Design Table Maps and Events <br />Task 4: Draft and Final Plan <br />Task 4.1: Plan Outline <br />After the final charrette, the KTU +A team will prepare an outline of <br />the plan and a list of any additional questions, concerns or critical <br />issues that might have emerged during or after the charrette. <br />These documents will be circulated to selected stakeholders <br />including city and school district staff, and the Advisory Group for <br />comment. <br />Task 4.2: Advisory Group Meeting #3 <br />Approximately two weeks after circulating the outline and list of <br />pending issues, the KTU +A team will conduct the third, and last, <br />Advisory Group Meeting to discuss the outline, resolve any out- <br />standing issues that might still be pending and review proposed <br />concepts. At this meeting, KTU +A may present a series of short <br />videos of the final designs incorporated with Google Street View, <br />maps or other media. This technique is a great way to visually <br />navigate through the different recommended projects. This also <br />allows the city to present the projects to the general public and <br />city officials in a creative and visually appealing way. <br />Task 43: Administrative Draft Plan <br />The KTU +A team will prepare and circulate an administrative draft <br />plan for review by city staff and members of the Advisory Group. <br />The plan will include recommendations to improve conditions for <br />all modes within the five study corridors and connecting corridors. <br />The plan will include conceptual designs in plan view, section <br />Sample report page from Downtown Santa Ana Complete Streets Plan <br />and 3D models and development standards for Improved road <br />safety and operations, pedestrian, bicycle and transit facilities, and <br />enhanced streetscapes. Special attention will be given to streets <br />that are used by children to access schools. <br />To assist with future implementation, the plan will include detailed <br />cost estimates of the recommendations.The plan will utilize <br />KTU +A's cost estimation tool, along with the city's and KONs latest <br />estimates.The plan will also contain a record of the charrette <br />process, project prioritization, and potential funding sources and <br />complete street guidelines. <br />Task 4.4: Draft Plan Comments <br />The KTU +A team will circulate the draft plan to city and school <br />district staff, and the Advisory Group for feedback. City staff will <br />collect and review all comments and provide a comprehensive set <br />of comments to the KTU +A team. <br />Task 4.5: Final Plan <br />The KTU +A team will finalize the plan. Similar to the Downtown <br />Complete Streets Plan, the plan will be visually appealing, easy <br />to read and informative. KTU +A will ensure that the Santa Ana <br />Central Complete Streets Plan will be another award - winning plan <br />that continues city's efforts to make their streets safe for all users. <br />Task 4.6: Present Plan to Policymakers <br />Once the final plan is completed, the KTU +A team will present the <br />plan to the Environmental and Traffic Advisory Committee and to <br />the City Planning Commission, <br />Task 4 Deliverables <br />Plan Outline, Meeting Notes, Draft Complete Streets Plan, Comments, <br />Final Complete Streets Plan, Digital Presentation, Meeting Notes <br />Central Santa Ana Complete Streets Plan 2FPNo,:15 -067 25I -19 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.