Task 5 - Project Meetings <br />The DEAteam will attend up to three meetings with staff throughout the duration of the project in addition <br />to the start -up meeting. Fees are based on an average meeting time of 3.5 hours which includes travel <br />time. If additional meetings are required or desired, they will be charged on a time and material basis <br />and approved by the City prior to attendance. <br />Deliverables: Attendance at up to 3 project meetings during the design development / construction <br />document phase of work. <br />Task 6 — Site Utility Plan <br />DEA will perform utility research in preparation of the preparation of a site utility plan. This research will <br />include searching for available record utility data within or adjacent to the project limits. DEA will gather <br />available information from the utility purveyors regarding their facilities in the project area. Underground <br />plan utilities will be mapped by record public information only; subsurface utilities that are not identified <br />on existing record maps will not be shown. <br />The record utility information will be used to determine points of connection for irrigation and domestic <br />water in the preparation of a site utility plan. DEA's engineers will prepare the site domestic water plan. <br />DEA's Landscape Architects will prepare the site irrigation plan as noted below. <br />Deliverables: Data collection, utility research and the preparation of a site utility plan to provide irrigation <br />and domestic water to the project site. <br />Task 7 — Horizontal Control Plans <br />DEA will prepare a 1"= 20' scale horizontal and vertical control plan for the project depicting a survey <br />control line and dimensions to pertinent site features for use in the layout of the park and site features <br />during construction. <br />Deliverables: V'= 20'scale horizontal and vertical control plan. <br />Task 8- Preliminary Hydrology and Hydraulics Report and Grading and Drainage Plans <br />DEA will prepare a preliminary drainage study for the project site. A rational method analysis of the site <br />will be performed addressing the pre and post construction 10- and 50 -year storm events. The rational <br />analysis will determine the pre -and post - construction surface flow and serve as the basis for sizing of <br />on -site drainage facilities to retain the difference in the pre- and post- construction conditions. <br />DEA will prepare a 1"= 20' scale precise grading, drainage and paving plan for the project depicting <br />grading contours, slopes, retaining walls (if required), finish surface elevations, drainage patterns, <br />swales, typical cross sections, details and proposed civil related improvements including pavement, <br />hardscape flatwork, and access ramps. The plan will consider ADA requirements for accessibility. <br />Deliverables: I"= 20'scale grading and drainage plan. <br />Task 9 — Water Quality Management Plan (WQMP) (Optional Task if necessary) <br />In the event that impervious paving improvements at the play area and fitness area are greater than <br />5,000 sf, DEA will prepare a WQMP for the project site. The WQMP will include Best Management <br />Practices (BMP's) required, per current regulation, to be implemented upon completion of the project and <br />throughout the use of the project site. The WQMP will be prepared in accordance with the requirements <br />of the County of Orange NPDES Stormwater Program requiring the preparation of the plan. <br />Deliverables: Preparation, processing and obtaining approval of the WQMP. <br />Task 10 — Erosion Control Plan <br />Plan will include the preparation of erosion control measures for use in construction to reduce sediment <br />transport within the site. <br />Deliverables: I" = 20' Erosion Control Plan. <br />25L -23 <br />