My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EPIC LAND SOLUTIONS-2015
Clerk
>
Contracts / Agreements
>
E
>
EPIC LAND SOLUTIONS-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2016 5:09:00 PM
Creation date
9/30/2015 11:46:43 AM
Metadata
Fields
Template:
Contracts
Company Name
EPIC LAND SOLUTIONS
Contract #
A-2015-161
Agency
PUBLIC WORKS
Council Approval Date
8/4/2015
Expiration Date
8/4/2020
Insurance Exp Date
10/1/2016
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
access to Epic's progress can be provided to the City for real -time visibility into project progress. <br />Epic will review the entire work product for compliance using approved check -off sheets for <br />each functional area. Each file will have a review checklist attached to the file prior to close out <br />and delivery to the client. <br />Agents - All agents working on a project are to self- inspect their own documents and coordinate <br />at least one additional peer review. If the agent is the creator, they are to provide a QC <br />Checklist with their name and date leaving a space for the reviewers to initial. Review of the <br />agent's work, regardless of position or title, shall not in any way, abdicate the responsibility of <br />the originator of the product to perform within the standards of the industry. <br />Each document created will have a corresponding QC Checklist attached and it will be included <br />in the file or sent to the client for quality control assurance. <br />Document Storage and Version Control - Epic utilizes the latest technology and management <br />systems to facilitate the protection and transmittal of critical project information. Project <br />Managers store all documents in protected file structures within our fully integrated SharePoint <br />database system, which allows for controlled access requirements, selective editing abilities and <br />document version tracking. SharePoint is stored on Microsoft cloud -based server farms which <br />allow for near 100% up -time accessibility, built -in backups, and hardware redundancies. <br />Epic has full -time staff dedicated to document control and the development/maintenance of <br />Epic's SharePoint system. SharePoint automatically conducts comprehensive version control <br />and modification tracking. Each change to any project document is tracked and can be rolled <br />backed, if necessary. In addition, SharePoint allows for visibility into the specific staff person <br />that made specific changes, as well as simultaneous document change collision management. <br />Budget - Determining a budget on right of way and property management projects can be <br />challenging given the number of factors that may not be apparent when performing the <br />estimation. For example, although the designer, right of way team and appraiser may make <br />certain assumptions about how a property's access or parking are impacted by the project, the <br />property or business owner may have additional information that is not available through public <br />moans. At each decision point, Epic will provide the City with options, including benefits, risks <br />and costs for the City's ultimate decision. <br />Schedule - Epic will create a schedule which contains all key deadlines and ensures individual <br />steps can be completed to meet each deadlines. The schedule will start with the City's schedule <br />and the detailed steps reflect internal knowledge of timeframes and sequence. Activities which <br />require concurrence will be identified, as well as those required predecessors. Epic's team will <br />meet regularly throughout the project to verify the schedule and ensure target dates are <br />feasible. Epic's disciplined program management system includes frequent project schedule <br />monitoring. This identifies any schedule impacts and allows for time - critical issues to be <br />addressed immediately, circumventing costly delays in the project. Additionally, Epic will <br />generate a project budget to reflect all anticipated costs. Updates will also be provided to the <br />City on a regular basis. <br />m> <br />Status Reporting - Epic will actively manage several areas of risk from project start. Some <br />issues to consider may be valuation issues, schedule, survey and right of way engineering, <br />utility communications and environmental assessments. Epic will prepare written status reports <br />at the client's request, whether weekly, biweekly or monthly. Statuses include milestones <br />reached and parcel diary text for each case, as well as project plan updates. Epic's reports <br />strive for "at -a- glance" information that immediately conveys case progress and highlights key <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.