My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - AGMT - PD SOFTWARE SYS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
11/17/2015
>
25B - AGMT - PD SOFTWARE SYS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2015 2:33:31 PM
Creation date
11/12/2015 1:58:24 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
25B
Date
11/17/2015
Destruction Year
2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8) Ensuring TriTech personnel have sufficient time (per the project schedule), resources, and expertise <br />to carry out their respective tasks and responsibilities. <br />1.4 General Clem Responsibilities <br />In addition to the Client responsibilities stated elsewhere in this SOW, the Client is responsible for: <br />1) Electrical facilities (e.g., outlets, generator and other electrical infrastructure facilities) required for <br />this project, including necessary maintenance. <br />2) Cabling (e.g., power, network, interface and other electrical and data transmission lines) required for <br />this project, including necessary maintenance. <br />3) Notwork /communications connections (e.g., LAN/WAN, commercial wireless, telephone, VPN, and <br />other voice /data, connections) in accordance with System Planning Document, or ongoing <br />network/communications charges associated with installation, operation or support of the proposed <br />system including the establishment and maintenance of security accounts. <br />4) Configuration and /or programming of network routers, switches and bridges — this includes <br />providing information to TriTech staff on any firewalls within the overall network that the system <br />will operate and necessary port access for the system to operate. <br />5) The installation, configuration, and post- installatiou maintenance (including patch management and <br />upgrades) of Microsoft software required by the System. <br />6) The initial infrastructure staging and preparation including: installation of servers into racks, <br />provisioning of virtual machines, and the cormection of such servers to network switches. <br />7) The assignment of machine names and 11? addresses for servers to be utilized by the System. This <br />includes joining the servers to the network and the assignment of security accounts as specified by <br />TriTech documentation. <br />9) Any hardware and third party software or services necessary for implementing the System that is not <br />listed in the Purchase Agreement as a TriTech Deliverable (not listed as a line item in the Price and <br />Payment section of the Purchase Agreement). This includes workstations, server hardware, network <br />equipment, telephone or TDD equipment, performance test software, Microsoft licenses, Disaster <br />Recovery Software, and services required to extract legacy data and convert into acceptable data <br />formats. <br />8) Third Party Systems that the Client operates and which will be interfaced with as a part of this <br />project. The Client is responsible for maintaining and supporting these systems in good working <br />order. The Client is responsible for providing Application Programming Interface (API) <br />documentation to these systems within thirty (30) days of a written request from TriTech. <br />9) Consoles, furniture or fixtures as well as any modifications to install equipment used for Systems or <br />Subsystems specified by the Agreement (into existing consoles, furniture, vehicles or existing <br />facilities). <br />10) Ensuring that Client personnel have sufficient time (per the project schedule), resources, and <br />expertise to carry out their respective tasks and responsibilities and have a consistent representation <br />in the Project activities. <br />11) Reviewing and (upon agreeing to the content) approving any Functional Acceptance Tests (FAT) <br />documents, OSDs, IRDs, Task Completion Reports (TCR) and/or other project documentation <br />within the timelines defined in the Agreement. <br />12) Providing a facility with the required computer and audio- visual equipment for training. <br />r <br />
The URL can be used to link to this page
Your browser does not support the video tag.