My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - AGMT - PD SOFTWARE SYS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
11/17/2015
>
25B - AGMT - PD SOFTWARE SYS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2015 2:33:31 PM
Creation date
11/12/2015 1:58:24 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
25B
Date
11/17/2015
Destruction Year
2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
j) Prepare and submit a TCR. <br />7.6.3.2 Client Responsibilities <br />a) Provide adequate facilities to hold the DOLE to include an overhead projector. Two projectors are <br />preferred. DOLF also requires workstations for each participant. <br />b) Ensure complete participation of Central and Local Inform RMS Administrators for the purposes of <br />reviewing the RMS configuration as- built. <br />c) Provide participants that are versed with the ability to continue the configurations, or Code File build <br />once ownership transfers. <br />d) Assume ownership for the continued build and maintenance of the system under the guidance of the <br />TriTech project teain. <br />e) Ensure participation of key stakeholders and decision- makers in the DOLF process. <br />f) Observe the change control process for any requested software changes. <br />g) Review and approve the applicable TCRs. <br />h) Review and approve the content of the Inform RMS "DOLF Report". <br />i) Review and approve the "Inform RMS Journal ". <br />Completion Criteria <br />This task is considered complete when: (i) the hiform RMS DOLF has been completed; (ii) the DOLF <br />Report has been approved by the Client; (iii) the DOLT related content of the RMS Subsystem journal has <br />been reviewed and approved by the Client; (iv) the Client has received the Inform RMS User and <br />Administration Guides; (v) Client has confirmed that code files designated as pre -DOLF and during -DOLF <br />have been successfully installed into the Inform RMS. <br />7.6.4 Inform 1 M$Workshop(s) <br />After the Inform RMS DOLF has been completed, the TriTech project team will conduct an Inform RMS <br />workshop session at the Client site. This session is intended to be an extension to the Inform RMS DOLF for <br />more complex implementations and multi jurisdictional agencies as specified in the contract. <br />7.6.4.9 TriTech Responsibilities <br />a) Schedule the Inform RMS Workshop in accordance with the Client's availability and the Project <br />Schedule. <br />b) Prepare and distribute the meeting agendas and documents for Client review or completion to all <br />required attendees two weeks prior to each meeting. <br />e) Conduct the meetings based on the distributed agenda. <br />d) Prepare and submit a TCR upon completion of the workshop. <br />7.6.4.2 Client Responsibilities <br />a) Provide adequate facilities to comfortably hold the training activities. <br />b) Ensure participation of the appropriate personnel. <br />e) Continue the code file building activities after completion of this training. <br />d) Review and approve the applicable TCR. <br />44 <br />25B -90 <br />
The URL can be used to link to this page
Your browser does not support the video tag.