My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25I - AGMT - PUMP STATION SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
01/19/2016
>
25I - AGMT - PUMP STATION SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2016 5:05:15 PM
Creation date
1/14/2016 2:24:13 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25I
Date
1/19/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the planned station improvements to ensure that the Project PCS Integrator's deliverahlcs ,and <br />tasks are being executed in compliance with the accepted specifications. Eighty (Stl) hours of <br />ProJect PCS Intmrator deliverables review support are anticipates[ for the Wahout Station, <br />6, Act us the City's agent during factory and on -site functional and performance acceptance testing. <br />Consultant shark document identified a,ll fan0ionad and pertbrmance discrepancies and <br />coordinate corrective actions to resolve identified discrepancies prior to City acceptance. 40 <br />hours for FAT validation and 60 hours for SAT validation are anticipated for the Walnut Shation, <br />7. On an as- acceded basis, Consultant shall provide on -site supporl fur commissioning (start -up) <br />activities, in close coordination with the Walnut Purnp Station Improvements Contractor and <br />PCS Integrator. Consultant shall be present during system commissioning to verify all aspects of <br />the control systern and associated proQess equipment are exercised and to ensure; deticiencics are <br />corrected by the C:onlractonTC'S Integrator as they arc found. Comrnisiirnaing will not be <br />considered complete until the Consultant has determined that kill of the system requirements have <br />been met, 60 hours for eernarnissianirrg sulaport are anticipated for the Walnut Station. <br />8, Devetop standard control system programming guidelincs and procedures ihr use on the Walnut <br />Station preoject aas well as future improvement project,, at other City Water Production facilities, <br />Consultant shall provide recornmendatiom fear use of generic structured text, standardized <br />functional blocks, standardized ladder logic, or other alternative languages. `Chose guidelines and <br />procedures shall he developed in collaboration with (lie City Water Production Team: however, <br />the experience ofthe selected consultant will lye heavily leveraged for this tank. <br />a. Consultant shall provide re.cornmendations fora standardized I110 inandrig convention. <br />b. 'Tile C011sraltan1. shall develop application programming templates, subroutines, finaction <br />blocks, and data structures, to anininaize the level of custom programming required to add <br />oloeraeble assets to any sites each as pump stations. Simulaardized templates and modules <br />shall serve as starting points liar future programming efforts. <br />e. The Consultant shalt develop standard requirements for Laser defined access levels, <br />d, llrof ramming guidelines shall address rexluireaaaents for software backup plans to ensure <br />that system ,,ollwtue components (Sits PLC programs) are routinely archived and <br />available lbr use in restoring the symorn should restoration become necessary. <br />e. Guidance shall address program documentation standards including black diagrams Of <br />logic sequence referenced to the control strategy specification-, fully commented logic, <br />coverall control sequence cornments at the slarl of each Program file and at the start of <br />each major Logic block, and reftwences to logic descriptions to the control strategy <br />specifications. <br />I.:. Cluid�elines shall address CIh'II standardization including screen layont. pop -up windows, <br />icons, navigation bars, mouse button use, function key controls, animation, <br />communication protocol with 111-C's, screen navigation flow, and event and alarm log <br />screens. Cruidaaaee oak the use of tag number, equipment description, and system <br />description within fIMl screens shall also be addressed. <br />City or Santa Ana RFP 16 -105 <br />261=24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.