Laserfiche WebLink
Understanding of Need <br />Alternative Charrette Schedule #2 <br />Another alternative is to hold two separate charrettes based on <br />the locations of the corridors. For example, the 5th Street and Raitt <br />Street corridors, along with connecting corridors, can be held one <br />week, then Bishop Street, St. Andrews Place and Orange Avenue <br />another week.The overall charrette schedules can be very similar <br />with tours, exercises, on-site production and activities. <br />For all charrette schedule alternatives, the closing workshop will <br />be a platform for additional comments and design refinements. As <br />with all other charrette activities and schedule, these options can <br />be vetted through the Advisory Group. <br />Closing Workshop Presentation <br />The closing workshop presentation will consist of draft recom- <br />mendations to the community for feedback, comments and guid- <br />ance.This could be a combination of plotted maps orthrough a <br />Powerpoint presentation. <br />Task 3 Deliverables <br />Sign-up Sheets from alipublic events, Results of Exercises, Digital <br />Presentations, Photographs of Design Table Maps and Events <br />Task 4: Draft and final Plan <br />Task 4.1: Plan Outline <br />After the final charrette, the KTU+A team will prepare an outline of <br />the plan and a list of any additional questions, concerns or critical <br />issues that might have emerged during or after the charrette. <br />These documents will be circulated to selected stakeholders <br />Including city and school district staff, and the Advisory Group for <br />comment. <br />Task 4.2: Advisory Group Meeting #3 <br />Approximately two weeks after circulating the outline and list of <br />pending issues, the KTU+A team will conduct the third, and last, <br />Advisory Group Meeting to discuss the outline, resolve any out- <br />standing Issues that might still be pending and review proposed <br />concepts. At this meeting, KTU+A may present a series of short <br />videos of the final designs incorporated with Google Street View, <br />maps or other media.This technique is a great way to visually <br />navigate through the different recommended projects.This also <br />allows the city to present the projects to the general public and <br />city officials In a creative and visually appealing way. <br />Task 4.3: Administrative Draft Plan <br />The KTU+A team will prepare and circulate an administrative draft <br />plan for review by city staff and members of the Advisory Group. <br />The plan will include recommendations to improve conditions for <br />all modes within the five study corridors and connecting corridors. <br />The plan will include conceptual designs in plan view, section <br />Sample report page from Downtown Santa Ana Complete Streets Plan <br />and 3D models and development standards for improved road <br />safety and operations, pedestrian, bicycle and transit facilities, and <br />enhanced streetscapes. Special attention will be given to streets <br />that are used by children to access schools. <br />To assist with future implementation, the plan will include detailed <br />cost estimates of the recommendations. The plan will utilize <br />KTU+A's cost estimation tool, along with the city's and KOA's latest <br />estimates.The plan will also contain a record of the charrette <br />process, project prioritization, and potential funding sources and <br />complete street guidelines. <br />Task 4.4: Draft Plan Comments <br />The KTU+A team will circulate the draft plan to city and school <br />district staff, and the Advisory Group for feedback. City staff will <br />collect and review all comments and provide a comprehensive set <br />of comments to the KTU+A team. <br />Task 4.5: Final Plan <br />The KTU+A team will finalize the plan. Similar to the Downtown <br />Complete Streets Plan, the plan will be visually appealing, easy <br />to read and informative. KTU+A will ensure that the Santa Ana <br />Central Complete Streets Plan will be another award-winning plan <br />that continues city's efforts to make their streets safe for all users. <br />Task 4.6: Present Plan to Policymakers <br />Once the final plan is completed, the KTU+A team will present the <br />plan to the Environmental and Traffic Advisory Committee and to <br />the City Planning Commission. <br />Task 4 Deliverables <br />Plan Outline, Meeting Notes, Draft Complete Streets Plan, Comments, <br />Final Complete Streets Plan, Digital Presentation, Meeting Notes <br />Central Santa Ana Complete Streets Plan RFP No.: 15-067 16 <br />