Laserfiche WebLink
5. Check starter wiring & contacts as required. <br />6. Check motor amperage & voltage as required <br />7. Check Intake air filter, replace as required. <br />Air Handlers: <br />1, Provide Pour (4) quarterly Inspections and maintenance for (46) Air Handlers. <br />2. Preventive maintenance as required. <br />3. Lock -out and Tag -out equipment as required. <br />4. Check starter contacts for excessive wear as needed, <br />5. Tighten all starter wire connections as required. <br />6. Check belts, adjust or replace as needed. <br />7. Check pulley sheave alignment, adjust as required. <br />8. Meg -Ohm motor and record annually. <br />9. Check fan motor(s) amps. <br />9. Clean and lubricate unit motor bearings and fan bearings. <br />10. Check operation of economy dampers. <br />11. Lubricate all dampers and linkages as necessary. <br />12. Check operation of static vane (if applicable) <br />13. Visually check all coils for leaks (Annually) <br />14. Check and record all coil delta T (Annually) <br />15. Inspect all mounting hardware, tighten as needed. <br />Multi -zone Air Handlers: 911 Dispatch Area <br />1. Provide annual Preventive Maintenance Inspection on two (2) York Air Handlers. <br />2. Preventive maintenance as required. <br />3. Lock -out and Tag -out equipment as required. <br />4. Check fan motor amps as required. <br />5. Clean and lubricate components as required. <br />6. Check operation of economy dampers as required. <br />7. Check operation of static vane or dampers as required. <br />8. Check operation of zone dampers as required. <br />9. Check and adjust operating and safety controls as required. <br />Package Chiller: <br />Lock -out and Tag -out equipment as required. <br />Check condenser / Barrel tubes as required. <br />Check Chiller barrel tube as required. <br />Check and record unit amp draw as required. <br />Check unit Voltage and Record as required. <br />Check unit pressures and record as required. <br />Chiller with Reciprocating Compressors <br />1. Provide annual vibration analysis for two (2) York Chillers. <br />2. Provide annual leak test for two (2) York Chillers. <br />3. Provide four (4) quarterly inspections and maintenance for two (2) York Chillers. <br />4. Provide chiller controls coolant for two (2) York Chillers <br />3. Visually inspect equipment condition and operation as required. <br />4. Check for unusual vibration, noise, excessive temperatures & refrigerant leaks as required. <br />5. Check unit voltage and record as required. <br />6. Check unit operate and records as required. <br />7. Check unit operating hours and record as required. <br />8. Check condenser pressure and record as required. <br />Facilities HVAC Service, Maintenance and Repairs 15 -114 <br />Page 13 <br />I �, <br />