My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EBS GENERAL ENGINEERING INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
EBS GENERAL ENGINEERING INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2016 4:19:29 PM
Creation date
3/22/2016 10:41:34 AM
Metadata
Fields
Template:
Contracts
Company Name
EBS GENERAL ENGINEERING INC.
Contract #
16-7523
Agency
Public Works
Council Approval Date
2/2/2016
Notes
Projects Linked- RFCA
Document Relationships
23A - PROJ - RESIDENTIAL STREET REPAIR
(Related to)
Path:
\Agenda Packets / Staff Reports\City Council (2004 - Present)\2016\02/02/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 12 <br />CITY OF SANTA ANA <br />WOMEN OWNED/NIINORITYBUSINESS OWNED ENTERPRISES <br />(W/MBE) GOOD FAITH EFFORTS <br />Project Name: <br />Project Number: <br />Project Location: <br />Pursuant to 24 CFR Part 85 § 85.36 (e) of Code of Federal Regulations, contractor must take all necessary <br />affirmative steps to assure that minority business firms, women's business enterprises and labor surplus firms are <br />used whenever possible. <br />Contractor shall submit the following information to demonstrate that a goof faith effort has been made to comply <br />with the above section of the Code of Federal Regulations. Submittal of this form, in and of itself, may not <br />provide sufficient documentation to demonstrate that goof faith effort was made. Documentation such as <br />copies of advertisement, letters of solicitation, telephone logs, rejected quotes, etc. should accompany this <br />form. <br />1. The names and dates of advertisement of each newspaper, trade paper, and minority -focus paper in which a <br />request for W/MBE participation for this project was placed by the bidder: <br />2. The names and dates of written notices sent to W/MBE soliciting bids for this project and methods used for <br />following up initial solicitation to determine with certainty whether the W/MBE were interested. <br />Names of <br />W/MBE Solicited <br />Dates of <br />Solicitation <br />Follow-up Methods <br />and Dates <br />The items of work which the bidder made available to W/MBE firms, including, where appropriate, any <br />breaking down of the contracts into economically feasible units to facilitate W/MBE participation, and the <br />information furnished to W/MBE such as plans, specifications, and requirements for the work. <br />Items of Work: <br />Breakdown of Items: <br />Information Furnished: <br />F:\DOCS\PROPSVCS\HUDFORMS\MBU5B04AMB- Section3Spem DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.