Laserfiche WebLink
Mater Del High School <br />(9) Parking Structure and School Expansion Project <br />Environmental Impact Report <br />Consistency with Regional Plans. Development associated w th the proposed project would not <br />result in a conflict with regional plans. <br />Findings <br />Chatages or alterations gape been aquired in, or incorporated into, the project, iebieh avoid or substantially <br />lessen The signoeant eneironmental t fesx at idsnlifeed in the Drgft EIR <br />2. The gftls identified in the Dre f3 EIR have been determined trot to he agnifleant. <br />Facts in Support of Findings <br />The ptojecCs consistency impacts with regional plans have been eliminated or substantially lessened <br />to a level of less than significant by virtue of the mitigation measures identified in the Draft EIR. <br />Alitigation measures: <br />AQ -1 Prior to issuance of any Grading Permit, the City Engineer and the Building Safety <br />Manager shall confirm that the Grading Plan, Building Plans, and specifications <br />stipuuate that, in compliance with SCAQMD Rule 403, excessive fugitive dust <br />emissions shall be controlled by regular watering or other dust prevention measures, <br />as specified in the SCAQ1VUs Rules and Regulations. In addition, SCAQIVID Rule <br />402 requires implementation of dust suppression techniques to prevent fugitive dust <br />from creating a nuisance off -site. Implementation of the following measures would <br />reduce short -term fugitive dust impacts on nearby sensitive receptors: <br />+ <br />All active portions of the construction site shall be watered every three hours <br />during daily construction activities and when dust is observed migrating from the <br />project site to prevent excessive amounts of dust. <br />® Pave or apply water every three hours during daily construction activities or <br />apply non -toxic soil stabilizers on all unpaved access roads, parking areas, and <br />staging areas. More frequent watering shall occur if dust is observed migrating <br />from the site during site disturbance. <br />• Any on -site stockpiles of debris, dirt, or other dusty material shall be enclosed, <br />covered, or watered Ltvice daily, or non -toxic soil binders shall be applied. <br />• All grading and excavation operations shall be suspended when wind speeds <br />exceed 25 miles per hour. <br />• Disturbed areas shall be replaced with ground cover or paved finmediately after <br />construction is completed in the affected area. <br />• Track -out devices such as gravel bed tack -out aprons (3 inches deep, 25 feet <br />long, 12 feet wide per. lane and edged by rock berm or row of stakes) shall be <br />Statement of Facts and Findings 19 ,tune 2015 <br />