My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENTERPRISE AUTOMATION INC.-2016
Clerk
>
Contracts / Agreements
>
E
>
ENTERPRISE AUTOMATION INC.-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2017 4:11:11 PM
Creation date
5/31/2016 11:21:38 AM
Metadata
Fields
Template:
Contracts
Company Name
ENTERPRISE AUTOMATION INC.
Contract #
A-2016-011
Agency
PUBLIC WORKS
Council Approval Date
1/19/2016
Expiration Date
1/31/2019
Insurance Exp Date
11/13/2017
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A4Of6- AT -10N <br />Nothing Leaves Enterprise untested <br />Enterprise Automation <br />210 Goddard Irvine CA 92618 USA <br />Tel 949-769-6000 Fax 949-769.6005 <br />vv m.eaintegmtorcom <br />1. For City and EA staff to meet and conduct introductions <br />2. Review the project scope <br />3. Reviewthe project implementation process <br />4A,2 Projekt schodule <br />The PM will develop a project schedule which will be submitted in electronic (pdf) <br />format. The PM will periodically update the schedule and publish revised versions, up <br />to the point that majority of schedule risk leading up to commissioning has been <br />mitigated. <br />41.3 City check-in meetings, <br />The PM and a key technical resource from EA will perform monthly check-in <br />teleconferences with the City and provide meeting minutes. <br />4,2 Site audit <br />4.2.1 Faci icy insrection <br />As required by the RFP scope, EA will inspect and document the condition of the <br />controls at the existing facility and catalog the existing controls hardware. An <br />allowance of two 8 hour days for 2 EA engineers has been provided. <br />4.2,P-fechniā¬:al Memorandum <br />EA will then prepare a technical memorandum containing the following information: <br />1. An evaluation of the condition of the existing controls equipment <br />2. Recommendations for enhancements to existing controls <br />3. Recommendations to standardize controls hardware across the City <br />Once complete, EA will submit the memorandum to the City for review. <br />To ensure the City's complete understanding of the memorandum, EA will conduct a <br />half day workshop with the City to review, explain, and discuss the contents as <br />necessary. We believe that the City's understanding of the memorandum will be <br />rapidly advanced by this additional workshop. [This is additional scope added by <br />EA]. <br />Following the workshop and receipt of the City's review comments, EA will update the <br />documentation per City comments. <br />Page Number, 5 of 11 <br />Pump station too <br />
The URL can be used to link to this page
Your browser does not support the video tag.