My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - OCWD CENTENNIAL PARK
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
06/21/2016
>
25C - AGMT - OCWD CENTENNIAL PARK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2016 9:59:52 AM
Creation date
6/16/2016 3:53:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25C
Date
6/21/2016
Destruction Year
2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 5 <br />Toxic Air Contaminants <br />The toxic air contaminants emissions for Alternative 3 would be less than for the <br />Proposed Project because one less injection well would be constructed and <br />redeveloped under Alternative 3. Potential toxic air contaminant emission <br />impacts under Alternative 3 would be less than significant. <br />Alternative 4. Pipeline Design, Alternative <br />Carbon Monoxide Holspots <br />Similar to the Proposed Project, Alternative 4 would generate a negligible amount <br />of construction and operation traffic. Therefore, Alternative 4 would not increase <br />congestion at major signalized intersections in the area. There would be no <br />exposure of sensitive receptors to elevated levels of local CO emissions, <br />Criteria Pollutants from On-Site Construction <br />Under Alternative 4, the construction and operational localized air quality impacts <br />would be similar as the Proposed Project and would be less than significant. <br />Toxic Air Contaminants <br />The toxic air contaminants for Alternative 4 would be similar to the Proposed <br />Project and would be less than significant. <br />Mitigation Measure <br />No mitigation measures required. <br />Level of Impact <br />Alternative 1. No adverse impact <br />Alternative Z Less than significant adverse impact <br />Alternative 3: Less than significant adverse impact <br />Alternative 41 Less than significant adverse impact <br />Mid Basin Centennial Park Adfiffl Project Final EIR 5-30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.