My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - OCWD CENTENNIAL PARK
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
06/21/2016
>
25C - AGMT - OCWD CENTENNIAL PARK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2016 9:59:52 AM
Creation date
6/16/2016 3:53:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25C
Date
6/21/2016
Destruction Year
2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Executive Summary <br />• Ensure that the operation of the Mid Basin Centennial Park Injection Well <br />Project does not result in permanent loss of usable open space. <br />Ensure that during construction and operation of the Mid Basin Centennial <br />Park Injection Well Project safety conflicts with students from Godinez <br />High School, Mitchell Child Development Center and from Centennial <br />Education and Day Care Center are avoided. <br />Ensure that the construction and operation of the Mid Basin Centennial <br />Park Injection Well Project is compatible with park facilities. <br />Project Design Features <br />The following design features have been incorporated into the Mid Basin <br />Centennial Park Injections Well Project. <br />Noise Reduction <br />To minimize noise impacts to the environment Sound walls would be <br />proved around each well site. <br />a) MBI-2 will have a 24-foot high temporary sound barrier on the <br />northeast, southeast, and southwest sides of MBI-2 construction <br />area, <br />b) MBI-3 will have a 24-foot high temporary sound barrier on the <br />north, east and west sides of MBI-3 construction area. <br />c) MBI-4 will have a 24-foot high temporary sound barrier around the <br />perimeter of MBI-4 construction area. <br />d) MBI-5 will have a 24-foot high temporary sound barrier around the <br />perimeter of MB 11-5 construction area. <br />e) The Monitoring Well will have a 24-foot high temporary sound <br />barrier around the perimeter of the Monitoring Well construction <br />area and will also have an 8-foot high sound blanket located on the <br />north and east sides of the air compressor. <br />To minimize potential noise during the day when school would in session <br />at Godinez High School, Mitchell Developmental School and Centennial <br />Education Center, the construction of the water supply pipeline and back <br />wash pipeline would Occur at night. <br />• The Heritage Museum site improvements would occur when school is not <br />in session at Mitchell Development School and Godinez High School <br />Mid Basin Centennial Park IuLerl <br />,,jff_4Js Project Final EAR ES-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.