My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - OCWD CENTENNIAL PARK
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
06/21/2016
>
25C - AGMT - OCWD CENTENNIAL PARK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2016 9:59:52 AM
Creation date
6/16/2016 3:53:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25C
Date
6/21/2016
Destruction Year
2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 1 <br />Program environmental review requirements. The CEQA-Plus Federal <br />Consultation Review analysis is presented in Section 8 of the EIR/EA. <br />1.3 Public Consultation <br />The scope of this Draft EIR/EA includes issues identified by OCWD during <br />preparation of the Notice of Preparation of EI!R (NOP) and Initial Study (IS) for <br />the Project, and issues raised by other agencies and the public in response to <br />the IS/NOP. The IS/NOP was circulated for the mandated 30-day public review <br />period from May 28, 2014 to June 28, 2D14. The NOP was circulated to various <br />Federal, State, regional and local governmental agencies and other interested <br />parties who were contacted to inform them of the Project and to solilcit comments <br />regarding project implementation. Comment letters that were received during the <br />review period are summarized below in Table 1, The IS/NOP, along with <br />comment letters received, are included in Appendix A of this Draft EIR/EA. <br />Table 1: I'SINOP Comment Letters <br />AgencylOrganization <br />Key Issues Identified <br />Location In D51WEA <br />Where Addressed <br />California State <br />Acknowledgment OCWD complied <br />Section 1.4 <br />Clearinghouse <br />with Notice of Preparation public <br />review requirement <br />County of Orange <br />Long term water quality impacts <br />Section 5.8 Impact HVVQ-5 <br />Changes to existing drainage patterns <br />Section 5.8 Impact HVVQ-3 <br />Erosion /Siltation Impacts <br />Section 5.8 Impact HWQ-4 <br />Impacts to Edinger Avenue Bridge <br />Section 5.8 Impact HVVQ-7 <br />Impacts to County Right-of —Way <br />Mitigation Measures HWQ - <br />1, HWQ-4, IHWQ-5 <br />California Department <br />No Comment <br />Appendix A <br />Transportation <br />Rancho Santiago <br />Loss of parking spaces from repaving <br />Section 3,3 Repaving of <br />Community College District <br />Centennial Park parking lot <br />Compliance with Noise Standards <br />Section 5.10.4 <br />Student Construction Safety Conflicts <br />Section 5.11 Impact T -3 <br />Santa Ana Unified School <br />Impacts to wetland site <br />Section 5.3 Impact 1510-3 <br />District <br />City of Fountain Valley <br />Travel Time Impact Analysis <br />Section 7,74 Impact HVVQ-2 <br />Mid Basin Centennial Park 11 All Project Final EIR 1-3 <br />Ift.01 rydidw_U <br />
The URL can be used to link to this page
Your browser does not support the video tag.