Laserfiche WebLink
• Wood windows shall be free of significant dry rot, water damage and termite damage. <br />• Wood surfaces shall be free of damaged or deteriorated paint. <br />• Illegal or inoperative window bars shall be removed. <br />Damaged or deteriorated paint shall be evaluated far the presence of lead and the control of lead -based hazards <br />in housing built before 1978. <br />Estimated Remaining Useful Life (ERUL) <br />• Windows shall have an estimated remaining useful life of at least five years. <br />• Housing projects consisting of 26 or more units are required to provide a capital needs assessment to <br />ensure that windows will be maintained during the period of affordability. <br />ON -GOING COMPLIANCE <br />• Deficiencies that pose an imminent threat to public health or safety must be addressed immediately. <br />BUILDING INTERIOR <br />FLOORS <br />NEW CONSTRUCTION PROJECTS <br />• Compliance with all current codes, standards and ordinances is required. <br />• The use of green and sustainable materials is required. <br />REHAB / ACQUISITION / ON -GOING COMPLIANCE <br />• Compliance with all applicable codes (federal, state, and local) is generally required. Some pre- existing, <br />non - conforming conditions may be allowed as long as required permits were obtained and they meet the <br />minimum standards described below. <br />• The use of green and sustainable materials is required when flooring is being replaced. <br />MINIMUM STANDARDS (REHAB / ACQUISITION / ON -GOING COMPLIANCE) <br />• All floors shall be safe, sound and free of significant defects, damage, or deterioration. <br />• Floors shall be free of significant dry rot, water and termite damage. <br />• Carpeting shall be properly tacked and free of buckling. <br />• Floor coverings shall be properly secured and free of trip hazards. <br />Estimated Remaining Useful Life (ERUL) <br />• Structurally, floors shall have an ERUL of at least 15 years. Finishes shall have an ERUL of at least five years. <br />• Housing projects consisting of 26 or more units are required to provide a capital needs assessment to <br />ensure that the floors will be maintained during the period of affordability. <br />ON -GOING COMPLIANCE <br />Deficiencies that pose an imminent threat to public health or safety must be addressed immediately. <br />BUILDING INTERIOR <br />WALLS AND CEILINGS <br />City of Santa Ana Community Development Agency <br />Request for Qualifications for Community Housing Development Organizations (CHDO) <br />Page 39 <br />19F -42 <br />