Laserfiche WebLink
NEW CONSTRUCTION PROJECTS <br />• Compliance with all current codes, standards and ordinances is required. <br />REHAB / ACQUISITION / ON -GOING COMPLIANCE <br />• Compliance with all applicable codes (federal, state, and local) is generally required. Some pre- existing, <br />non - conforming conditions may be allowed as long as required permits were obtained and they comply with <br />the minimum standards below. <br />NEW CONSTRUCTION PROJECTS <br />• Compliance with all current and applicable codes and standards (federal, state and local) is mandatory. <br />REHAB / ACQUISITION / ON -GOING COMPLIANCE <br />• Compliance with all applicable codes and standards (federal, state and local) is generally required. Some <br />pre- existing, non- conforming conditions may be allowed as long as required permits were obtained and <br />they meet the minimum standards described below. <br />MINIMUM STANDARDS (REHAB / ACQUISITION / ON -GOING COMPLIANCE) <br />• All walls and ceilings shall be safe, sound and free of significant defects, damage and deterioration. <br />• Walls and ceilings shall be free of dry rot, water damage and termite damage. <br />• Surfaces shall be sanitary and free of mold and mildew. <br />• All trim and paneling (if present) shall be intact and free of significant damage or deterioration. <br />• Acoustic materials and paint shall be free of significant damage or deterioration. <br />Damaged or deteriorated paint shall be evaluated for the presence of lead and the control of lead -based hazards <br />in housing built before 1978. When applicable, damaged or deteriorated materials shall be evaluated for the <br />presence of asbestos and the control of asbestos hazards. <br />Estimated Remaining Useful Life (ERUL) <br />• Structurally, walls and ceilings shall have an ERUL of at least fifteen years. Finishes shall have an ERUL of at <br />least five years. <br />• Housing projects consisting of 26 or more units are required to provide a capital needs assessment to <br />ensure that the walls and ceilings will be maintained during the period of affordability. <br />ON -GOING COMPLIANCE <br />f Deficiencies that pose an imminent threat to public health or safety must be addressed immediately. <br />BUILDING INTERIOR <br />INTERIOR DOORS <br />NEW CONSTRUCTION PROJECTS <br />• Compliance with all current codes, standards and ordinances is required. <br />REHAB / ACQUISITION / ON -GOING COMPLIANCE <br />• Compliance with all applicable codes (federal, state, and local) is generally required. Some pre- existing, <br />non - conforming conditions may be allowed as long as required permits were obtained and they meet the <br />minimum standards described below. <br />City of Santa Ana Community Development Agency <br />Request for Qualifications for Community Housing Development Organizations (CHDO) <br />Pa e 40 <br />19F -43 <br />