My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
STATES LINK CONSTRUCTION, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
STATES LINK CONSTRUCTION, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 3:13:09 PM
Creation date
10/27/2016 1:24:26 PM
Metadata
Fields
Template:
Contracts
Company Name
STATES LINK CONSTRUCTION, INC.
Contract #
Various
Agency
Public Works
Council Approval Date
6/5/2006
Document Relationships
2005-11-07
(Amends)
Path:
\Minutes\CITY COUNCIL\2000-2009\2005
2006-06-05
(Amends)
Path:
\Minutes\CITY COUNCIL\2000-2009\2006
2007-04-02 Regular
(Amends)
Path:
\Minutes\CITY COUNCIL\2000-2009\2007
23A - EL SALVADOR CTR IMPROVEMENTS
(Amends)
Path:
\Agenda Packets / Staff Reports\City Council (2004 - Present)\2006\06/05/2006
23A - EL SALVDOR CENTER
(Amends)
Path:
\Agenda Packets / Staff Reports\City Council (2004 - Present)\2007\04/02/2007
23B - BID REJECTION EL SALVADOR CENTER
(Amends)
Path:
\Agenda Packets / Staff Reports\City Council (2004 - Present)\2005\11/07/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t Clr ' OF SANTA ANA <br /> T'4 PUBLIC WORKS AGENCY <br /> G <br /> i CONTRACT CHANGE ORDER <br /> 'u l <br /> Project Number PROJECT NOS. 04-6375, 04-7709, 05-7806; EL Change Order Number 1 <br /> SALVADOR CENTER RENOVATION AND PARK <br /> IMPROVEMENTS <br /> To States Link Construction, Inc. Contractor <br /> You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br /> specifications on this contract. <br /> NOTE:THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br /> Unless otherwise stated,rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br /> Change requested by PUBLIC WORKS AGENCY <br /> EXTRA WORK AT AGREED LUMP SUM PRICE <br /> 1. Modify the existing concrete drive approach and adjacent concrete walkways per City of <br /> Santa Ana letter dated June 12, 2006 and as directed in the field. (PCO No. 1) <br /> AGREED PRICE = 13,091 <br /> 2. Modify the existing landscaping at the front of the facility per City of Santa Ana letter <br /> dated October 16, 2006 and as directed in the field. (PCO No. 2) <br /> AGREED PRICE = $648 <br /> 3. Exterminate the facility for termites per City of Santa Ana letter dated November 1, 2006. <br /> (PCO No. 3) <br /> AGREED PRICE = $4,432 <br /> 4. Modify the demolition plans per City of Santa Ana letter dated October 16, 2006 and as <br /> directed in the field. (PCO No. 4) <br /> AGREED PRICE = $9,507 <br /> 5. Modify the HVAC system per the approved shop drawings and as directed in the field. <br /> (PCO No. 5) <br /> AGREED PRICE = $13,346 <br /> 6. Provide and install data conduits and relocate exposed conduits per City of Santa Ana <br /> letter dated October 25, 2006 and as directed in the field. (PCO No. 6) <br /> AGREED PRICE = $18,794 <br /> 7. Modify the roofing system per City of Santa Ana letter dated November 2, 2006 and as <br /> directed in the field. (PCO No. 7) <br /> AGREED PRICE = $20,177 <br /> Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.