My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25J - AGMT - ZOO RIVER OTTER
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
12/20/2016
>
25J - AGMT - ZOO RIVER OTTER
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2016 10:39:33 AM
Creation date
12/15/2016 4:54:36 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25J
Date
12/20/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TASK 1: PRE -DESIGN & <br />TASK 2: CONCEPT DESIGN <br />The focus of this phase will be to affirm the project vision, analyze the selected project <br />site, the existing habitat and holding facility, and surrounding context within the Zoo, and <br />secure the program. We propose multiple on-site workshops (see Schedule) to jump start <br />the concept testing process and to establish the overall look & feel for the project. At the <br />completion of Task 2, the project team will work together to establish the project budget <br />breakdown, precise scope of work, and schedule moving forward. <br />Key Tasks: <br />Reaffirmation of project goals and objectives. <br />• Project Team brainstorming and collaboration to develop the project vision. <br />Analysis of the existing facilities and identification of opportunities and constraints. <br />Confirm current and future operational uses. <br />Review and confirm animal husbandry guidelines/regulations per AZA and USDA. <br />• Outline/identify requirements of other governing authorizes such as, stormwater <br />management practices, site and building permit requirements, utilities, seismic, <br />environmental, energy and water usage objectives, CASP, etc. <br />• Lock -down preliminary building plan layout, as well as basic site development needs <br />and service access. <br />• Completion of Basis of Design for all architectural and engineering requirements. <br />• In collaboration with the Owner, prepare an Opinion of Probable Costs for the project <br />program established. <br />Water Filtration/LSS Tasks include: <br />Communicate with the Team, to determine the specific requirements for the LSS. TJP <br />will provide answers to client questions related to Life Support and water treatment as <br />required to explain how proposed processes meet the Zoo's needs. <br />Define LSS processes for water quality requirements of the exhibit(s). <br />Provide recommendations for the location of the LSS, space requirements, and LSS <br />processes. <br />Provide Process Flow Diagrams (PFD) for life support systems. The LSS processes will <br />include water treatment facilities recommendations and design of water treatment <br />equipment to provide water quality per industry standards and design leader's <br />requirements. Design includes sizing and specifying filtration equipment, disinfection <br />equipment (ozonation and/or chlorination), and strategies for misc LSS water <br />treatment appurtenances. <br />The 100% complete Schematic Design (Tasks 1 and 2) milestone will allow for the overall <br />design, program and associated costs to be confirmed, as well as the necessary scope of <br />architectural and engineering services required to fully execute the project. The services <br />and deliverables noted below for Design Development, Construction Documentation, <br />Bidding and Permitting, and Construction Administration are preliminary at this time <br />and will be reconfirmed at the completion of Schematic design. <br />22 CLR I AMST 22, 2016 <br />25J-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.