Laserfiche WebLink
01TY 'OIF' SANTA ANA <br />RFP NO;: 16-090 <br />WATER WELL;, PUMP AND MOTOR REPAIR SERVICES <br />submersibles, boosters, horizontal split case, well turbines, and engine waster„ Repair of :all ,pumps <br />may Include,, but not limited to, line shafts, bearings, right -angle -gears, housing/frame, column pipe,, <br />complete rebuild of pump/mator unit, motor rewinding, seats, impellers, rotor shaft, power/oontrol cable <br />attachments, thermal/moisture sOnsors, and all other appurtenant components. Furnish new replacement <br />vertical turbine pumps, well pumps, motors, and mechanical seals as. needed- Repair and service pump <br />station natural gas or diesel -run engines, generators, equipment housings, and appurtenant parts <br />Including, but not limited to, radiators, starters, water cooling pumps, gear drives, etc. The Contractor <br />shall provide the Project Manager with its evaluation and'recommandatfon,ncluding cost estimates per <br />project. All repair work shall be subject to Project Manager's written approval prior to commencing any <br />work by the Contractor. <br />The Contractor shall pickup and deliver pumps and motors (booster pump) for repairs from all sites <br />requested. <br />4. WELL VIDEO SURVEY SERVICE <br />The Contractor shall be qualified to perform water well video Inspections using color video equipment <br />with side scan and down -hole survey views. Videos shalt be produced in DVD format in standard <br />definition with a pixel resolution of 64C x 480 pixels or at higher resolutions. Ability to perform these <br />surveys at higher resolutions. will be given higher consideration. <br />The video survey unit shalt simultaneously transpose the City's name, well name, footage and the date of <br />inspection on the monitor screen and the video record. A footage counter/recorder shall read In feet and be <br />accurate within 2 percent of the actual footage., <br />The video survey carneca shall be capable of right angle or normal dowrrhole vlewlrig'with a change fri <br />camera lens or mechanical movement of the camera. At the direction of the City, the Contractor must be <br />ogle to provide right angle, viewing to view any, casing section In a direct elevation view. <br />5. WELL REHABILITATION AND TREATMENT SERVICE <br />The Contractor shall be qualified to provide well rehabilitation, and treatmenf se, rvices. Furnish all portable <br />engine -drivers. pumps, necessary to perform well redevelopment and rehabilitation,. Costs for temporary <br />piping, sound proofing, and related equipment require approval by the Project Manager, <br />To perform these tasks, the Contractor shall have the capability to perform mineral analysis, bhernical <br />treatment,, water quality testing', zone testing, well casing patches and similar casing <br />repaimliimprovements, and mechanical treatment on well casings. All .chemicals used in treating wails <br />shall be State. approved for the.purpose intended, must be National Sanitation Foundation (NSF) <br />approved, and Public Works approved for quantity and concentration. <br />The Contractor's estimates shall include the typical type and concentration of chemicals (acids, <br />Inhibitors, polymers, neutralizers, etc.) to be used; the typical appropriate contact time for the. <br />chemicals; and the typical procedure for introducing, mixing, and neutralizing chemicals in the well, in <br />addition, the name(s) and phone numbers of any company (ies) that will supply the treatment chemicals <br />shall be provided. Completed Material Safety Data Sheets (MSDS) for all chemicals used shall include <br />the methods of mechanical treatment (dual swab, wirefnylon brush, sonarjetfing, etc.). <br />6. ELECTRIC MOTOR REPAIR AND REFURBISHMENT <br />The successful Contractor shall provide all transportation, labor, materials, tests and equipment, <br />