My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EXCEL PAVING COMPANY
Clerk
>
Contracts / Agreements
>
PROJECTS
>
EXCEL PAVING COMPANY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2024 3:28:52 PM
Creation date
1/12/2017 12:24:27 PM
Metadata
Fields
Template:
Contracts
Company Name
EXCEL PAVING COMPANY
Contract #
15-6848
Agency
Public Works
Council Approval Date
11/15/2016
Destruction Year
2021
Notes
PROJECT
Document Relationships
23B - PROJ - BICYCLE BLVDS
(Amends)
Path:
\Agenda Packets / Staff Reports\City Council (2004 - Present)\2016\11/15/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 15-6848 <br />BISHOP-PACIFIC-SHELTON BIKE BLVDS <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />31 <br />Construct Type `B" Catch Basin (L=7') <br />EA <br />1 <br />$ <br />$ <br />. including Local Depression <br />(OtooO - <br />O <br />32 <br />Remove Interfering AC Pipe and Replace <br />LF <br />20 <br />$ <br />$ <br />with PVC Pipe complete in Place <br />P9 <br />TOTAL BASE BID <br />$ <br />ADD ALTERNATIVE ONE <br />33 <br />Unclassified Excavation* <br />CY <br />75 <br />$ <br />$ <br />C)(7.' <br />r�CCj» <br />34 <br />Construct PCC Sidewalk (T=4")* <br />SF <br />225 <br />$ <br />$ <br />35 <br />Construct PCC Curb Ramp* <br />SF <br />960 <br />$ <br />$ <br />36 <br />Construct PCC Curb only (B-1)* <br />LF <br />265 <br />$ <br />$ <br />-7 <br />'✓ ,- <br />AM, <br />37 <br />Decomposed Granite with Stabilizer* <br />SF <br />2,100 <br />$ <br />$ <br />q•-11 <br />MM,' <br />38 <br />Furnish and Install Rock Boulder <br />LS <br />1 <br />$ <br />$ <br />0 6 i <br />� <br />39 <br />Landscaping <br />LS <br />1 <br />$ <br />$ <br />0U <br />-100. <br />40 <br />60 Working Days Landscaping <br />LS <br />1 <br />$ <br />$ <br />Maintenance <br />I f'il'l / <br />U <br />TOTAL ADD ALTERNATIVE ONE <br />$��M / <br />TOTAL BASE BID + ADD ALTERNATIVE ONE <br />$ <br />The lowest responsible bidder shall be selected based on the Total Base Bid. The City reserves <br />the right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any). <br />* The quantity for this bid item is shown for bid comparison only. This bid item shall not be <br />subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual <br />amount for this item will be dictated by the actual quantity used, and the Agency reserves the <br />right to increase or decrease the quantity of this item accordingly. <br />TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br />The undersigned bidder hereby proposes to complete the Work for the total base bid amount <br />shown above, within 80 working days after the commencement date stated in the Notice to <br />Proceed. Contractor shall stagger the intersection improvement work to be in multiple phases. <br />P-3 of P-18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.