Laserfiche WebLink
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 15-6848 <br />BISHOP-PACIFIC-SHELTON BIKE BLVDS <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />14 <br />Adjust Survey Monument to Grade <br />EA <br />2 <br />$ <br />$ <br />i <br />-000..1 <br />15 <br />Furnish and histall New Fire Hydrant <br />EA <br />4 <br />$ <br />$ <br />�Ooo, — <br />r <br />16 <br />Furnish and Install Water Valve Frame and <br />EA <br />1 <br />$ <br />$ <br />Cover to Grade <br />o0 <br />1�00 � <br />17 <br />Abandon Water Valve <br />FA -2— <br />$ <br />$ <br />18 <br />Furnish and Install New Water Meter Box <br />EA <br />5 <br />$ <br />$ <br />and Cover to Grade <br />/ 1� i <br />19 <br />Furnish and Install 12" Gate Valve <br />EA <br />2 <br />$ <br />$ <br />"W,- <br />20 <br />Furnish and Install 8" Gate Valve <br />EA <br />1 <br />$ <br />$ <br />' <br />350[7. <br />21 <br />Furnish and Install 6" Gate Valve <br />EA <br />1 <br />$ <br />$ <br />Moo. - <br />—22 <br />22 <br />Remove Fire Hydrant and Assembly <br />EA <br />4 <br />$ <br />$ <br />000 <br />V�0'Io. <br />23 <br />Furnish and Install Rock Swale* <br />SF <br />250 <br />$ <br />$ <br />24 <br />Landscaping <br />LS <br />1 <br />$ <br />$ <br />25 <br />60 Working Days Landscaping <br />LS <br />1 <br />$ <br />$ <br />Maintenance <br />r <br />5-0 <br />26 <br />Furnish and Install Organic Soil* <br />CY <br />62 <br />$ <br />$ <br />' <br />0 50,' <br />27 <br />Sighting and Striping <br />LS <br />1 <br />$ <br />$ <br />28 <br />Project Advertisement Sign <br />EA <br />2 <br />$ <br />$ <br />i <br />29 <br />Construct Concrete Collar <br />EA <br />1 <br />$ <br />$ <br />(1110,-., <br />V.� <br />30 <br />Furnish and Install Reinforced Concrete <br />LF <br />20 <br />$ <br />$ <br />Pipe(12" Diameter) <br />11 tq, <br />2 0F, i <br />P-2 of P-18 <br />