My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EXCEL PAVING COMPANY
Clerk
>
Contracts / Agreements
>
PROJECTS
>
EXCEL PAVING COMPANY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2024 3:28:52 PM
Creation date
1/12/2017 12:24:27 PM
Metadata
Fields
Template:
Contracts
Company Name
EXCEL PAVING COMPANY
Contract #
15-6848
Agency
Public Works
Council Approval Date
11/15/2016
Destruction Year
2021
Notes
PROJECT
Document Relationships
23B - PROJ - BICYCLE BLVDS
(Amends)
Path:
\Agenda Packets / Staff Reports\City Council (2004 - Present)\2016\11/15/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 15-6848 <br />BISHOP-PACIFIC-SHELTON BIKE BLVDS <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: <br />REQUIREMENT: <br />WMA <br />CE KTIMG <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the <br />following schedule: <br />Item <br />P-1 <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1 <br />Unclassified Excavation* <br />Cy <br />1,350 <br />$ y <br />�$✓��(�6�(� <br />2 <br />AC Pavement* <br />TN <br />1,100 <br />$ <br />3 <br />Crushed Miscellaneous Base (CMB)* <br />TN <br />36 <br />$ <br />$ <br />a.o <br />aC2 Izy.r <br />4 <br />Construct PCC Sidewalk (T=4")* <br />SF <br />13,000 <br />$$ <br />-lazo) — <br />5 <br />Construct PCC Curb Ramp* <br />SF <br />4,200 <br />$ <br />$ <br />6 <br />Construct PCC Driveway (T=6")* <br />SF <br />310 <br />$ <br />$ <br />7 <br />Construct PCC Curb only (B-1)* <br />LF <br />300 <br />`q, <br />$ <br />8 <br />Construct Curb and Gutter * <br />LF <br />2,000 <br />$1")000.-- <br />. <br />9 <br />Construct PCC Modified Curb(Traffic <br />SF <br />1,900 <br />$ <br />$ <br />Circle)* <br />N. (2 <br />2 (�� <br />134 3 ((0-. <br />10 <br />Construct Color Stamped Concrete <br />SF <br />1,800 <br />$ ac} a <br />$ <br />including rebar (T=10")* <br />11 <br />Construct PCC Cross Gutter (Local)* <br />SF <br />1,200 <br />$ <br />$ <br />(a• <br />MOM f <br />12 <br />Adjust Manhole Frame and Cover to Grade <br />EA <br />7 <br />$ <br />$ <br />13 <br />Adjust Water Valve Frame and Cover to <br />EA <br />9 <br />$ <br />$ <br />Grade <br />715,— <br />-715,— <br />P-1 of P-18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.