Laserfiche WebLink
C. A contractor' s minimum service shall be the <br /> minimum service offered by his service schedule that is at least <br /> equal to the Santa Ana service requirement, with both expressed <br /> in cubic yards. <br /> D. All data necessary to determine each contractor' s <br /> minimum service and corresponding rates will be provided. <br /> 4 . Calculate the total cost to Santa Ana customers if <br /> their service was provided under the service and rate schedules <br /> used in the cities of Anaheim, Fullerton, Huntington Beach and <br /> Orange. <br /> A. Multiply the number of containers by the <br /> contractor ' s rates for each Santa Ana service level . <br /> B . Total the results of the previous exercise . <br /> 5 . Calculate the average rate per cubic yard of <br /> Santa Ana service for each contractor. <br /> A. Divide the total cost to Santa Ana customers <br /> by the total cubic yards of service required in Santa Ana. <br /> 41 . <br />