Laserfiche WebLink
b) Selection of a proposal by the City obligates the Contractor to enter into an <br /> agreement with the City for the collection, transportation, recycling, yard <br /> waste diversion and disposal of solid waste on the basis of the terms and <br /> conditions of the proposal; and <br /> c) The Agreement shall not be binding or valid against the City unless and until <br /> it is executed by the City and the selected Contractor, and the Contractor's <br /> performance bond has been accepted by the City. <br /> E.6.7 Examination of Proposal Materials <br /> The submission of a proposal shall be deemed a representation and warranty by the <br /> Contractor that the Contractor has investigated all aspects of the RFP, that the <br /> Contractor is aware of the applicable facts pertaining to the RFP process, its <br /> procedures and requirements, and that the Contractor has read and understands <br /> the RFP. <br /> No request for modification of the provisions of a proposal shall be considered after <br /> its submission on the grounds that the Contractor was not fully informed as to any <br /> fact or condition. <br /> ,All data which maybe contained in the RFP or any addenda thereto is for <br /> informational u • ., • only. The City makes no warranty as to the accuracy of this <br /> informatio 1 udinub ut not im' d to w c P generation and disposal quantifiP <br /> numbernumbersicustameraatacervi pros id d cuurrent m p tru ure nd 1 o h r <br /> statistical data and descriptive information. The City disclaims any responsibility <br /> for any such information which may subsequently be determined to be incomplete <br /> or inaccurate. <br /> E.6.8 Rejection of Proposal for Proposal Inaccuracies <br /> The City reserves the right to reject any proposal submitted containing errors or <br /> inconsistencies in the proposal. Errors include support information that is <br /> inconsistent with total cost estimates or any other error of this type which <br /> demonstrates flaws in the calculations provided by the Contractor. <br /> E.6.9 Interpretation <br /> The City will not be responsible for or be bound by any verbal instructions or <br /> interpretations or explanations issued by the City or its representatives, without <br /> exception. <br /> Page 30 <br />