My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-6-1516)
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-6-1516)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2024 4:49:06 PM
Creation date
4/17/2017 12:24:34 PM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-6-1516)
Contract #
A-2017-064
Agency
Public Works
Council Approval Date
4/4/2017
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COOPERATIVE AGREEMENT NO. C-6-1516 <br />EXHIBIT B <br />responsible bidder in accordance with the AUTHORITY's Board of Director's approved procedures for <br />public works projects after a sealed bidding process. <br />4.1 CONSTRUCTION COORDINATION <br />The AUTHORITY is responsible for providing all direction to the Construction Contractor. Any <br />CITY direction related to AUTHORITY Project construction shall be directed through the <br />AUTHORITY's Project Manager or designee, who will coordinate with the Construction Contractor, <br />supplier, inspector, or designer. <br />The CITY shall approve all construction phasing affecting CITY Right of Way including <br />amendments to the Plans and Specifications. <br />4.2 BUSINESS ACCESS <br />The AUTHORITY shall coordinate with the CITY and shall reasonably minimize impacts to <br />vehicle and pedestrian access to affected businesses. <br />4.3 STREET CLOSURES & TRAFFIC CONTROL. <br />The CITY recognizes that street closures are necessary for construction of the Project and will <br />be identified to the extent possible in the Pians and Specifications. Regardless, the AUTHORITY is <br />required to submit traffic control plans and possible street closures for CITY approval in advance to <br />all street closures related to the Project. The AUTHORITY shall submit all requests for street closures, <br />regardless of duration, a minimum of 30 days prior to the date of the proposed closure and the CITY <br />shall approve, approve with conditions, or not approve such street closures within twenty-one (21) <br />days of such submittals. Once a closure has been approved, AUTHORITY shall notify the public <br />consistent with CITY traffic control requirements and Project Specifications. <br />The AUTHORITY will be responsible for all traffic signing and striping modifications and <br />additions necessary to provide safe and efficient vehicular and pedestrian movements during the <br />Project. All temporary traffic control shall be in compliance with the Work Area Traffic Control <br />Handbook (latest edition) or the California Manual of Uniform Traffic Control Devices (latest edition) <br />as applicable. <br />Exhibit B <br />Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.