My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-6-1516)
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-6-1516)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2024 4:49:06 PM
Creation date
4/17/2017 12:24:34 PM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-6-1516)
Contract #
A-2017-064
Agency
Public Works
Council Approval Date
4/4/2017
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COOPERATIVE AGREEMENT NO. C-6-1516 <br />EXHIBIT B <br />as was provided at the time of access and to repair any damages caused thereby. This access shall <br />be at no charge. <br />4.7 CONSTRUCTION INSPECTION <br />All CITY and AUTHORITY inspections shall ensure compliance with the Project Plans and <br />Specifications. <br />The AUTHORITY is responsible for the overall Project construction inspection. The CITY shall <br />perform inspections related to CITY facilities, including but not limited to pavement, striping, traffic <br />signals, water, sewer, storm drain, hardscape, street lighting, and landscaping. The CITY will <br />coordinate with the AUTHORITY on any deficiencies observed. <br />The CITY shall perform building inspections on the OC Streetcar Maintenance and Storage <br />Facility and traction power substation structures as required and consistent with the CITY's Planning <br />and Building department procedures. The CITY shall otherwise be permitted to conduct inspection of <br />any Project -related work by AUTHORITY requiring a CITY permit. <br />4.8 PROJECT SUBMITTALS <br />In advance of construction the AUTHORITY and the CITY shall develop a mutually agreed <br />upon submittal review process. The Parties agree to follow the process developed once the notice to <br />proceed for construction has been issued to the Construction Contractor. If the CITY believes a <br />submittal is materially incomplete and a complete response cannot be provided, written notice must <br />be provided to the AUTHORITY identifying what information is missing and what information is <br />necessary to complete a response. <br />4.8.1 Shop Drawings <br />Shop drawings will be submitted by the Construction Contractor to the AUTHORITY as <br />required in the Plans and Specifications. Shop drawings generally require review and an <br />acknowledgement of acceptance, rejection, or acceptance with modification. The AUTHORITY shall <br />route all shop drawings related to CITY facilities for CITY approval. <br />Exhibit B <br />Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.