My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IBI GROUP-2017
Clerk
>
Contracts / Agreements
>
I
>
IBI GROUP-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2017 2:53:55 PM
Creation date
6/27/2017 3:57:48 PM
Metadata
Fields
Template:
Contracts
Company Name
IBI GROUP
Contract #
A-2017-126
Agency
Planning & Building
Council Approval Date
5/16/2017
Expiration Date
11/30/2018
Insurance Exp Date
1/13/2018
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IBI Group <br />City of Santa Ana —April 27, 2017 <br />» OCTA Long Range Transportation Plan (2014) <br />» OCTA Transit Route amendments (2016) <br />» OCTA Transit Master Plan (to the extent available) <br />» Central Harbor Blvd Transit Corridor Study <br />To reduce the cost of this review, City staff will provide excerpts that represent significant <br />implications for either the Technical Appendix or the Policy. Framework. We will incorporate text <br />into both documents. <br />9b. Technical Appendix <br />The next task will be to revise the Technical Appendix to the Circulation Element. Prior to <br />commencement, we anticipate that the City will have reviewed the current materials, discussed <br />options, and decided upon the extent of revision necessary. In our review, we have identified <br />several sections that need updating: <br />• Revision of bicycle and pedestrian narrative. This would include the identifying and <br />discussing bicycle routes, current and planned mileage, safety information, Golden Loop, <br />and safe routes to schools. <br />• High Quality Transit Areas. A map of HQTAs and TPA should be provided as well as <br />narrative discussing potential opportunities and their ramifications for land uses. <br />• Transit Routes. Narrative on new transit routes, existing and planned, should be revised <br />as well as any future improvements that will impact Santa Ana. <br />• Complete Streets Plans. The current Technical Appendix does not address this topic. <br />Revisions will be needed to incorporate the Downtown and Central Santa Ana complete <br />street plans. <br />• Levels of Service. This section will need to be revised per City staff direction to incorporate <br />any new developments in multimodal levels of service <br />9c. Policv Framework <br />The current policy framework of the Circulation Element contains a vision, five goals, and 45 <br />policies that support the vision. While the policy framework is significant in coverage and many of <br />the prior work remains relevant, final revisions are needed to complete the policy, particularly from <br />tasks 12a and 12b. Since the majority of the policy framework remains relevant and timely, we will <br />focus our final work effort on three topics—active transportation, levels of service, and transit <br />opportunities. To complete this task, we assume that City staff will provide direction for necessary <br />revisions to the policy framework and any supplemental policy documents or direction needed to <br />expedite the completion of this task. <br />Our scope assumes that IBI, in concert with City staff, will develop implementation programs and <br />potential funding for the programs. Once complete, IBI would provide PlaceWorks with a final copy <br />of the identified programs and PlaceWorks would incorporate them into the final Circulation <br />Element. <br />9d. Circulation Element Maos <br />The current series maps in the Circulation Element are produced using Adobe Illustrator software. <br />In Amendment #2, we originally proposed to complete up to 4 maps in Adobe Illustrator. However, <br />from subsequent discussions, it appears that up to 12 maps will require revisions under <br />PlaceWorks' scope. We anticipate that 12 maps will need revision. <br />
The URL can be used to link to this page
Your browser does not support the video tag.