Laserfiche WebLink
Santa Ana/Garden Grove Fixed Guideway Project Addendum <br />The Project footprint and Area of Potential Effect (APE) for Cultural Resources study were also updated to <br />encompass the modifications as well as the anticipated revised construction limits of the Project. <br />Physicaiimprovemen[s: The modifications would result in the following physical improvements: <br />• Concrete Box Girder bridge at Westminster Avenue, <br />• Construction of a double track bridge across the Santa Ana River (SAR) north of a historic bridge location, <br />• Adding a bridge span on the west bank of the SAR, behind an existing levee to accommodate an <br />undercrossing for the SAR Trail and Bikeway (and Orange County Flood Control District (OCFCD) <br />maintenance road. Implementing a slight raise to the bridge (approximately one foot) to keep the pathway <br />higher than the water surface elevation in the river to allow for positive drainage to the river, <br />• Repositioning the double track alignment within the PE ROW, <br />• No Willowick Station Stop. This station stop is associated with future development. At this time there is no <br />development that is accessible to this station stop, <br />• Repositioning of side platforms to center platforms at Harbor Boulevard, Fairview Street (both west side), <br />and Raiff Street in the PE ROW segment of the Project alignment, <br />• Repositioning westbound platform at Ross Street from farside to nearside, and platforms at Broadway and <br />Main consolidated and moved to farside Sycamore Street, <br />• Placement of single crossovers on both sides of the Maintenance and Storage Facility (MSF) with a revised <br />layout for the MSF, added crossovers on both sides of downtown couplet, and replaced the tail track beyond <br />the SARTC platform with a double -crossover before the SARTC platform, <br />• Restriping Santa Ana Boulevard from Flower Street to Raiff Street from a four -lane to a two-lane street with <br />a raised 4 -ft median, <br />• Restriping westbound Santa Ana Boulevard from French Street to Flower Street from three -lanes to two - <br />lanes and a protected bike lane on the north side of the street, <br />• Relocation of the traction power substations (TPSS) to the PE ROW and publically owned properties and <br />reducing the number of TPSS from six to four, <br />• Re-evaluation of the scope of drainage improvements to mitigate additional surface storm water drainage <br />needs generated by the Project, or change in drainage patterns caused solely by the Project, <br />• Changing from single contact wire in the PE ROW to a two -wire catenary to enhance operations at higher <br />speed, and <br />4 I age 1170726.1 <br />Project Description <br />Update <br />Approved Projectin <br />ID <br />2015 EIR <br />30% Design - May 2016 <br />Figure <br />Modification of scope of drainage improvements to rely <br />less on connections to storm drain network and use <br />Appendix P to the EIR, the Drainage Technical <br />surface conveyance in streets to maintain existing <br />13 <br />Report, indicate storm drain improvements on <br />drainage patterns to the maximum extent practicable <br />11 <br />many streets outside the project alignment. <br />while addressing surface storm water drainage needs <br />generated by the Project, or change in drainage patterns <br />caused solely by the Project. <br />14 <br />Single contact wire in PE ROW. <br />Two -wire catenary in the PE ROW. <br />12 <br />Underground fiber optics cable (communications) from <br />15 <br />No provision for underground fiber optics cable <br />SARTC to OCTA Garden Grove Bus Annex north of PE <br />1 <br />ROW, approximately 1500 feet west of Harbor Blvd <br />The Project footprint and Area of Potential Effect (APE) for Cultural Resources study were also updated to <br />encompass the modifications as well as the anticipated revised construction limits of the Project. <br />Physicaiimprovemen[s: The modifications would result in the following physical improvements: <br />• Concrete Box Girder bridge at Westminster Avenue, <br />• Construction of a double track bridge across the Santa Ana River (SAR) north of a historic bridge location, <br />• Adding a bridge span on the west bank of the SAR, behind an existing levee to accommodate an <br />undercrossing for the SAR Trail and Bikeway (and Orange County Flood Control District (OCFCD) <br />maintenance road. Implementing a slight raise to the bridge (approximately one foot) to keep the pathway <br />higher than the water surface elevation in the river to allow for positive drainage to the river, <br />• Repositioning the double track alignment within the PE ROW, <br />• No Willowick Station Stop. This station stop is associated with future development. At this time there is no <br />development that is accessible to this station stop, <br />• Repositioning of side platforms to center platforms at Harbor Boulevard, Fairview Street (both west side), <br />and Raiff Street in the PE ROW segment of the Project alignment, <br />• Repositioning westbound platform at Ross Street from farside to nearside, and platforms at Broadway and <br />Main consolidated and moved to farside Sycamore Street, <br />• Placement of single crossovers on both sides of the Maintenance and Storage Facility (MSF) with a revised <br />layout for the MSF, added crossovers on both sides of downtown couplet, and replaced the tail track beyond <br />the SARTC platform with a double -crossover before the SARTC platform, <br />• Restriping Santa Ana Boulevard from Flower Street to Raiff Street from a four -lane to a two-lane street with <br />a raised 4 -ft median, <br />• Restriping westbound Santa Ana Boulevard from French Street to Flower Street from three -lanes to two - <br />lanes and a protected bike lane on the north side of the street, <br />• Relocation of the traction power substations (TPSS) to the PE ROW and publically owned properties and <br />reducing the number of TPSS from six to four, <br />• Re-evaluation of the scope of drainage improvements to mitigate additional surface storm water drainage <br />needs generated by the Project, or change in drainage patterns caused solely by the Project, <br />• Changing from single contact wire in the PE ROW to a two -wire catenary to enhance operations at higher <br />speed, and <br />4 I age 1170726.1 <br />