My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE - 75F
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2004
>
07/19/2004
>
CORRESPONDENCE - 75F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2018 4:05:53 PM
Creation date
8/9/2017 4:19:36 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda
Agency
Clerk of the Council
Item #
75F
Date
7/19/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
847
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sena Ana City Council <br />20 Civic Center Plaza <br />Santa Aaa, California 92702 <br />RZ: One Broadway Plaza <br />Honorabie Mayor and Council Members: <br />As a resident of Santa Alia, I am very excited to hear about the proposed One Broadway <br />Plaza project_ This projec. is essential for the city in many ways, Not only will One <br />Broadway Plaza be an Icon Landmark for the city, but also will provide economic <br />growth, which is desperately needed, for future success of Santa Ana. One Broadway <br />Plaza will give the City of Santa Aea the recognition as a cultural hub for Orange <br />County. This project will change the outside perception of Sams Ana and will gain the <br />pride and respect as the Capital City of Orange County, encouraging professional office. - <br />to relocate their headquarters to our downtown. <br />One Broadway Plaza's urban setting and location is ideal for the City of Santa Ana. So <br />many times, developers build on the outside edges of the city, which kills our downtown <br />areas. Having a Class A office building in the heart of Santa Ana will bring bat'sk life to <br />the Downtown/Mydtown areas, I appreciate the attention the developer has given in <br />succeasfblly weaving the historic past of Santa Ana with the fixture, providing urban <br />plains and gathering areas for the residents. <br />I am.100% Supportive of this project and encourage 100° o support, for the future success <br />of the city, from the council. Thank you .for the opportunity to share my excitement for <br />One Broadw y Pl= and the exciting growth ahead for the City of Santa Ana. <br />Sincerely, /V/XJ' 014 <br />_ <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.