Laserfiche WebLink
SCOPE OF SERVICES <br />2. The Microsoft Access Database (MDB) will be 'cleaned up." All blank and empty spaces within <br />the data base will be eliminated to ensure proper implementation into the City's GIS System. <br />3. Print out hard copy reports, along with a summary report for each line segment. This summary <br />report includes the operator, date, from/to manhole numbers, pipe size, material and length <br />inspected, During this process, a PDF report is generated for pipe segment that was inspected. <br />4. Convert all MPEG Videos to WMV (Windows Media Video). This ensures the City's specs are <br />met. During this process, the original video size will be reduced by about 40% of the original size, <br />while still providing a high quality video. <br />The digital media delivered to the City will be labeled with the following information: <br />Street name or location <br />Date of inspection <br />Contractor name <br />Video technician name <br />Pipe size, material and total length <br />The City designated start and ending manhole numbers <br />Direction of inspection <br />Data base number <br />NASSCO rating scores <br />Observation, comments, lateral references with footage and video clock <br />Pipe line segment using iWater ID <br />Each data base will have run numbers in sequential order starting with one (1) <br />Once completed, all data (including WMV Videos and Jpegs, Microsoft Access Database and Electronic <br />Reports) will be downloaded to a USB 3.0 External Hard Drive and delivered to the City within 15 calendar <br />days of the video inspection. <br />Scheduling <br />Based on the assigned tasks of varying footage totals, Houston & Harris PCS, Inc. will adhere to the <br />following procedure: <br />Upon receipt of assigned task, Houston & Harris will begin cleaning and video inspection within five (5) <br />working days. Once started, we will be onsite Monday through Friday from 7:00 AM until 3:30 PM daily <br />until the task is completed and will follow the cleaning and video inspection procedure as set forth <br />above in Phase 2 and Phase 3. <br />To complete the yearly assigned footage and allow for a smooth transition from one task to the next, we <br />offer the following suggestion: <br />Houston & Harris averages between 3,200 and 3,500 LF of cleaning and video inspection per day. <br />Using these figures and based on the size of the task presented, the number of days can be estimated <br />City of Santa Ana <br />Closed Circuit Television (CCN) Inspection of Sanitary Sewers_,_. <br />RFP NO.: 17-055 <br />r:-�`�; 21831 Barton Road <br />Grand Terrace, CA 92313 <br />909-422.89={k' 061 F <br />`� CA #8841 -LLQ} <br />