Laserfiche WebLink
EXHIBIT 3 <br />Pay Parking Lot <br />Valbridge HIGHEISTANDBESTUSE <br />PROPERTY ADVISORS <br />site would be for office, however, development at this time is not as feasible because rental rates <br />have not risen high enough to justify development. <br />Conclusion of Highest and Best Use As If Vacant <br />Based upon the preceding analysis, the conclusion of highest and best use of the subject site as if <br />vacant is as follows: <br />CONCLUSION AS IF VACANT <br />Characteristic Conclusion <br />Use: Hold for Development of Office <br />Analysis of Highest and Best Use as Improved <br />In determining the highest and best use of the property as improved, the focus is on three <br />possibilities for the property: 1) continuation of the existing use, 2) modification of the existing use, <br />or 3) demolition and redevelopment of the land. <br />Continuation of Existing Use <br />Retaining the improvements as existing meets the tests for physical possibility, legal permissibility <br />and financial feasibility. The site is asphalt paved with landscaping, curbs, gutters, and sidewalks on <br />the site. Thus, the continuation of the existing use as part of a public parking lot is a viable use. <br />Conversion/Modification <br />Conversion of the improvements meets the tests for physical possibility and legal permissibility. The <br />property is currently not being utilized to meet the current market expectations for the submarket in <br />which it competes. Modification of the property is financially feasible. <br />Demolition <br />As previously discussed, the new development of an office building appears to be financially feasible <br />as the increasing market rental rates would be high enough to support construction costs. Our final <br />opinion of market value plus demolition costs exceeds the value of the underlying land. <br />Interim Use <br />There are many instances where highest and best use will likely change in the foreseeable future. <br />The use of a property until it can be put to its terminal highest and best use is its interim use. Interim <br />uses are thus current highest and best uses that are anticipated to change in the foreseeable future. <br />Examples of these interim uses include farms, parking lots, and old buildings. The current use <br />represents an interim use. <br />Excess Land <br />Many parcels of land are too large for their principal highest and best uses. Such land parcels may <br />have, in effect, two highest and best uses — the use for the improved portion and another use for the <br />remaining, or excess, land. If excess land exists, it is valued separately within this report. The subject <br />property does not have any excess land. <br />Conclusion of Highest and Best Use As Improved <br />The highest and best use of the subject property, as improved, is its current use as a parking lot. <br />However, per current zoning, P (Professional), which was changed subsequent to the site's current <br />OO 2015 VALBRIDGE PROPERTY ADVISORS I Penner and Associates, Inc. Page 25 <br />SA4-57 <br />