My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KIMLEY HORN (2) - 2017
Clerk
>
Contracts / Agreements
>
K
>
KIMLEY HORN (2) - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 12:18:11 PM
Creation date
10/17/2017 4:30:02 PM
Metadata
Fields
Template:
Contracts
Company Name
KIMLEY HORN
Contract #
A-2017-273-01
Agency
Public Works
Council Approval Date
8/1/2017
Expiration Date
8/1/2019
Insurance Exp Date
4/1/2020
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 13, 2017 <br />Task 4: Record Research and Utility Coordination <br />Kimley-Horn will obtain readily available record drawings and data pertinent to the scope of services such as <br />record drawings, GIS mapping, and utility atlases. We will Initiate the utility company notification process early <br />in the design process and identify potential conflicts. We will maintain a utility agency tracking list to indicate <br />the status of communication and add a contact list for substructure and utility owner -operators for the <br />specifications. We will assist the City with a utility notification letter consisting of the following: <br />1. Utility Information Request <br />2. Prepare to Relocate Notice/Final Utility Notice Form <br />3. Notice to Relocate <br />We assume that utility notices will be on the City's letterhead. All related fees from utility companies are <br />excluded from this proposal. <br />Deliverables: Utility Agency Tracking List Utility Notification Letters <br />Task 5: Traffic Study <br />Kimley-Horn will prepare a traffic impact analysis report per the project specific requirements provided by the <br />City in the Attachment 5 of addendum one, We will analyze the following scenarios: <br />• Existing Conditions with Project Alternative 2; Existing Conditions with Project Alternative 3; Opening <br />Year No Project; Opening Year with Project Alternative 2; Opening Year with Project Alternative 3; <br />Year 2040 No Project ; Year 2040 with Project Alternative 2; Year 2040 with Project Alternative 3 <br />Collect AM and PM turning movement, pedestrian, and bicycle counts at the 29 study intersections listed. <br />Collect 24-hour daily counts at up to 6 roadway segments. Obtain cumulative projects within a 1.5-mile radius <br />of the project boundary to include in the traffic analysis. We assume the City will provide the current project <br />list to use. Opening year traffic will be based upon applying a growth percentage to existing traffic volumes <br />with cumulative projects in the area. Year 2040 traffic volumes will be derived using the Orange County <br />Transportation Analysis Model (OCTAM). We will review relevant traffic and parking studies in the area. We <br />assume these traffic and parking studies will be provided by the City. We will review the City provided traffic <br />collision history data over the last five years and assess up to six side street closures that will impact <br />circulation. Closures to be determined prior to the start of the traffic analysis task. <br />Deliverables: Traffic Counts, Draft Traffic Study, Final Traffic Study <br />Task 6: Environmental Studies <br />We assume that an Initial Study leading to a Mitigated Negative Declaration (IS/ MND) is the appropriate <br />CEQA documentation for the proposed project. The Initial Study will provide the necessary background for the <br />project. Each of the topics contained in the Environmental Checklist will be evaluated to document the nature <br />and extent of any potential environmental consequences and the need for mitigation. During the preparation <br />of the Initial Study we will determine if the project has significant impacts that cannot be fully mitigated, then <br />we will identify modifications to the project to reduce anticipated impacts. This may require a modified scope <br />and fee, such as preparing an EIR. Design alternatives may be presented to the City to select a preferred <br />alternative. This scope of services assumes that the Initial Study will be prepared for only the preferred <br />alternative. Using the City's Initial Study Checklist, Kimley-Horn will respond to each checklist question. The <br />analysis will use the following technical studies and data prepared by our team: traffic impact study, air quality <br />and greenhouse gas (GHG) study, noise study, utilities/ infrastructure, geotechnical study, drainage, Concept <br />Water Quality Management Plan, and a Phase I Environmental Site Assessment (ESA). All other environmental <br />topics would be studied qualitatively. Kimley-Horn will be responsible for the distribution of the IS/MND and <br />for preparation of responses to comments and a Mitigation Monitoring and Reporting Program (MMRP). <br />
The URL can be used to link to this page
Your browser does not support the video tag.